Message ID: 2     Entry time: Mon Feb 5 15:17:48 2024
Author: Konrad, Ragan, Peter 
Subject: Vacuum testing of the flange with water cooling 

Connected the flange with the cooling system in place, attached pictures represent the set up used. Currently testing for potential leaks as minimum pressure achived is 4.0e-5 mbar

Pressure (mbar) Time (sec)
8.7e-4 109
6.3e-4 125
4.5e-4 155
3.5e-4 190
1.2e-4 430
9.6e-5 570
8.1e-5 720
6.2e-5 1030

5.8e-5

1200
5.6e-5 1500
5.4e-5 1680
5.1e-5 1930
4.8e-5 2340
4.4e-5 3120
4.2e-5 4200
4.1e-5 4860
4.0e-5 6480

 

Attachment 1: 20240205_135233.jpg  1.960 MB  | Hide | Hide all
20240205_135233.jpg
Attachment 2: 20240206_102014.jpg  2.079 MB  Uploaded Tue Feb 6 10:43:00 2024  | Hide | Hide all
20240206_102014.jpg