AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 108     Entry time: Wed Dec 18 02:44:27 2019
Author: NH 
Subject: 17.12.19, 18.12.19  
Beam: 238U (850 MeV/u)
Fragment: 168Re

Tuning accelerator and FRS, believed since 3AM we are implanting on AIDA.

FEE issues:
One HEC in aida03 seems to be empty - LEC channel fills
aida09 has a lot of weird channels, check/load doesn't seem to fix
aida10 still no data after cable replaced

DSSD leakages OK - slightly higher now

Temps good


Fig 4: Rates 14:32

Leakages and temps good AS Before

Checking if we are implanting properly - possibly into the first DSSD at the moment

Fig 5 FRS PID
Fig 6 DSSD 
Fig 7 DSSD (PID gated)
Attachment 1: 1812-stats.png  107 kB  | Hide | Hide all
1812-stats.png
Attachment 2: 1812-leakages.png  11 kB  | Hide | Hide all
1812-leakages.png
Attachment 3: 1812-temps.png  56 kB  | Hide | Hide all
1812-temps.png
Attachment 4: 1812v2-Rates.png  104 kB  Uploaded Wed Dec 18 13:32:30 2019  | Hide | Hide all
1812v2-Rates.png
Attachment 5: nh_1712_zaoq.png  44 kB  Uploaded Wed Dec 18 15:22:57 2019  | Hide | Hide all
nh_1712_zaoq.png
Attachment 6: nh_1712_dssd.png  63 kB  Uploaded Wed Dec 18 15:23:06 2019  | Hide | Hide all
nh_1712_dssd.png
Attachment 7: nh_1712_dssd_id.png  37 kB  Uploaded Wed Dec 18 15:23:12 2019  | Hide | Hide all
nh_1712_dssd_id.png
ELOG V3.1.4-unknown