|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
DESPEC |
 |
|
Message ID: 143
Entry time: Wed Mar 11 23:44:27 2020
|
Author: |
OH |
Subject: |
Thursday 12th March 00:00-08:000 |
|
|
ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
BNC PB-5 pulser
amplitude 1.0V , attenuator x1
frequency 2Hz
decay time 1ms
00:44 Implantation range in AIDA - attachment 1
01:14 At current rate will run out of space in 35 hours ~ 18:00 hours on Friday 13th March.
During the day if possible it might be wise to try and obtain a USB3 HDD mount to mount one of the spare drives in
the AIDA boxes and begin moving files onto that
01:35 System wide checks all ok
Bias and leakage current ok - attachment 2
Stats all ok - attachment 3
FEE temperatures ok - attachment 4
TapeServer rate around 25-29MB per second
Merger rate around 2.6-3.2 million items per second
04:11 System wide checks all ok
Bias and leakage currents ok - attachment 5
Stats all ok - attachment 6
FEE temp ok - attachment 7
06:38 System wide checks all ok
Bias and leakage currents ok - attachment 8
Stats all ok - attachment 9
FEE temp ok - attachment 10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|