|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
DESPEC |
 |
|
Message ID: 144
Entry time: Thu Mar 12 08:04:24 2020
|
Author: |
OH, CA, TD |
Subject: |
Thursday 12th March 08:00-16:00 |
|
|
ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
BNC PB-5 pulser
amplitude 1.0V , attenuator x1
frequency 2Hz
decay time 1ms
09:00 Bias and leakage currents ok - attachment 1
Statistics ok - attachment 2
FEE temperatures ok - attachment 3
System wide checks all ok
09:08 No beam, not sure exactly how long it has been down.
FRS team are working on it
09:28 still no beam. issues with SIS.
DAQ set to NoStorage mode
most recent file R7_522
10.27 beam is back
writing to file R9_0
10.43 attachment 4 - hit rate spectra
11:09 all system wide checks ok
FEE64 temps ok - attachment 5
good event statistics ok - attachment 6
detector bias and leakage currents - attachment 7
11.18 merger ok, ~ 2.7 million data items per second
TapeServer ok, ~ 25 Mb/s data rate
Data forwarding to MBS ok
11.20 writing to file R9_39
11.22 beam off
11.24 beam back online (R9_42)
11.41 FRS has reverted to an older setting
13:04 hit rate spectra - attachment 8
13:19 all system wide checks ok
13:30 FEE64 temps ok - attachment 9
good event statistics ok - attachment 10
detector bias and leakage currents ok - attachment 11
15:31 good event statistics ok - attachment 13
detector bias and leakage currents ok - attachment 14
FEE64 temps ok - attachment 15
all system wide checks ok
beam seems to have stopped during 2pm meeting
15.35 TapeServer ok, data rate ~ 23 Mb/s
Merger ok, rate of 2.5 - 3 million data items per second
data forwarding to MBS ok
15.38 AIDA writing to file R9_233
16:02 beam back - AIDA writing to file R9_250
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|