|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
DESPEC |
 |
|
Message ID: 153
Entry time: Sun Mar 15 06:45:00 2020
|
Author: |
CA, LS, CG |
Subject: |
Sunday 15th March 08:00 - 24:00 |
|
|
ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
BNC PB-5 pulser
amplitude 1.0V , attenuator x1
frequency 2Hz
decay time 1ms
07:46 all system wide checks ok
good event statistics ok - attachment 1
FEE64 temperatures ok - attachment 2
detector bias/leakage currents ok - attachment 3
08:48 merger ok ~ 3 million data items/s
TapeServer ok ~ 27 MB/s
data forwarding to MBS ok
08:50 AIDA writing to file SecondDrive/TapeData/S480/R12_1524
09:56 all system wide checks ok
good event statistics ok - attachment 4
detector bias/leakage currents ok - attachment 5
FEE64 temperatures ok - attachment 6
12:09 all system wide checks ok
12:13 all system wide checks ok
good event statistics ok - attachment 7
FEE64 temperatures ok - attachment 8
detector bias/leakage currents ok, but ramping up - attachment 9
13:32 merger ok ~ 3 million data items/s
TapeServer ok ~ 23 MB/s
data forwarding to MBS ok
Beam seems to be off
13:33 AIDA writing to file R12_1743
*update* checked DESPEC S480 Elog, issues with UNILAC, beam lost at 13:29
13:55 beam back
13:57 AIDA writing to file R12_1759
14:35 all system wide checks ok
FEE64 temperatures ok - attachment 10
good event statistics ok - attachment 11
detector bias/leakage currents ok, but ramping up - attachment 12
15:18 merger ok ~ 2.7 million data items/s
TapeServer ok ~ 27 MB/s
data forwarding to MBS ok
AIDA writing to file R12_1283
16:00 1.8.H high energy spectra - attachments 13 & 14
hit-rate spectra - attachment 15
16.22 all system wide checks okay
FEE temperatures okay (attachment 16)
leakage currents okay and recorded to spreadsheet (attachment 17)
good event stats okay (attachment 18)
merger running at 3M items/sec
tape service running at 26MB/sec
18.00 began compressing R7 files with command: nice -n 10 gzip -v R7_* &
all system wide checks okay
FEE temperatures okay (attachment 19)
leakage currents okay and recorded to spreadsheet (attachment 20)
good event stats okay (attachment 21)
merger running at 3M items/sec
tape service running at 27MB/sec
20.10 all system wide checks okay
FEE temperatures okay (attachment 22)
leakage currents okay and recorded to spreadsheet, detectors 1 and 2 still rising (attachment 23)
good event stats okay (attachment 24)
merger running at 3M items/sec
tape service running at 25MB/sec
rates histogram (attachment 25)
low energy histograms (attachment 26 and 27)
high energy histograms (attachments 28 and 29)
22.07 all system wide checks okay
FEE temperatures okay (attachment 30)
leakage currents okay and recorded to spreadsheet (attachment 31)
good event stats okay (attachment 32)
merger running at 3M items/sec
tape service running at 25MB/sec
currently on R12_2097
23.56 all system wide checks okay
FEE temperatures okay (attachment 33)
leakage currents okay and recorded to spreadsheet (attachment 34)
good event stats okay (attachment 35)
merger running at 3M items/sec
tape service running at 26MB/sec
finishing up now. night shift group have been informed how to check up on AIDA, there is a sheet on the table with relevant information
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|