DESPEC |
 |
|
Message ID: 179
Entry time: Mon Mar 8 07:02:17 2021
|
Author: |
CA, LS |
Subject: |
Monday 8th March 08:00 - 17:00 |
|
|
08:00 ASIC settings 2019Dec19-16.19.51
DSSSD#1 slow comparator 0xa
DSSSD#2 slow comparator 0xa
DSSSD#3 slow comparator 0xd
BNC PB-5 Pulser
Amplitude 1.0V
Attenuation x1
Frequency 2Hz
tau_d 1ms
- polarity
Delay 250ns, tail pulse
All system wide checks ok *except aida06 fails clock status 6*
Statistics - attachment 1
FEE Temperatures - attachment 2
Bias and leakage currents ok - attachment 3
08:20 Merger ~4.5M data items/s
TapeServer ~ 45MB/s
Writing to file R6_1148
09:00 Beam off for optimisation - writing to file R6_1212
Expected back at 09:30
09:30 Beam will be off for a bit longer - an hour or two
09:34 All system wide checks ok *except aida06 fails clock status 6*
Statistics - attachment 4
FEE Temperatures - attachment 5
Bias and leakage currents ok - attachment 6
Merger ~4.5M data items/s
TapeServer ~ 45MB/s
10:10 (NH) Stopped DAQ to try the new merger from VP, new run R7, R8 for these tests
Tape rate was 110 MB/s (!) and MBS relay seemed nothing... also it didn't stop when DAQ was stopped but took 10+ seconds
to finish
Something confusing, will look at data and report to VP
Reverted to original merger and back... 45 MB/s
R9
12.00 (LS)
System wide checks okay except 'FEE64 module aida06 global clocks failed, 6'
Statistics (attachment7)
FEE temps (attatchment8)
Rate spectra (attachment9), beam still down
Leakage Currents written to sheets (attachment10)
Merger ~45M items/s
Tapeserver ~43MB/s
14.00 Still no beam but is expected to return soon
System wide checks okay except 'FEE64 module aida06 global clocks failed, 6'
Statistics (attachment11)
FEE temps (attatchment12)
Leakage Currents written to sheets (attachment13)
Merger ~45M items/s
Tapeserver ~44MB/s
14.40 Leakage currents still rising slowly compared to previous days, so will keep an eye on them (attachment14)
15.00 Beam is back (attachment15)
Still writing to R9 (roughly around R9_386)
15.28 No beam (attachment16)
15.41 Beam back (attachment17)
Roughly R9 (roughly around R9_439)
16.00 Analysis of R9_469, from FEE0 and FEE2 the hit rate for one side is around 48 HEC data items/second (attachment18)
16.20 System wide checks okay except 'FEE64 module aida06 global clocks failed, 6'
Statistics (attachment19)
Spectra Rate (attachment20)
FEE temps (attatchment21)
Leakage Currents written to sheets (attachment22),
still rising but looking on Grafana 7 day period should start to lower around 17.00
Merger ~45M items/s
Tapeserver ~43MB/s
16.55 Beam down (attachment23), back a couple minutes later
15.51 beam down (attachment24)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|