AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 33     Entry time: Fri Mar 22 14:31:24 2019
Author: NH 
Subject: A few more setup notes I forgot 

Extra FEE information:

HV braid (0 V) goes into FEE10 (beam left) with LK1 jumper
HV core (-160 V) goes into FEE09 (top)

Could be related to noise in FEE09?
Both these FEEs have higher rates too

Other setup information:
According to the switch in S4, the AIDA workstation is only connected via 100Mbps rather than 1Gbps. (Fig 1)

Plastic is inside the snout, but is not yet connected to the electronics yet
Figures 2-4 Show the DSSD & Plastic in the Snout. Plastic is far upstream solely to ensure plenty of ribbon cable

Attachment 1: 20190322_132528s.jpg  244 kB  | Hide | Hide all
20190322_132528s.jpg
Attachment 2: 20190319_131821s.jpg  156 kB  | Hide | Hide all
20190319_131821s.jpg
Attachment 3: 20190313_161102s.jpg  237 kB  | Hide | Hide all
20190313_161102s.jpg
Attachment 4: 20190313_155418s.jpg  225 kB  | Hide | Hide all
20190313_155418s.jpg
ELOG V3.1.4-unknown