AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 395     Entry time: Fri Feb 11 12:09:24 2022
Author: NH 
Subject: Fri 11 Feb AIDA Work 
Use beam break between FRS experiments to finalise getting AIDA testable for PJCS etc.

USB hubs reconnected - all 16 ttyUSBs seem to be visible now

New inverter installed (Ortec 533 Sum Invert, brand new) - Pulser T connected to input B1 and inverted out B sent to -ve FEEs

VME crate for VETAR2 is powered on so White Rabbit should be available

All grounds reconnected on FEEs

All FEEs connected to pulser chain again

-

Moved interlock to new Al shelf on AIDA rack so it's not kicked
Powered on OK, all 4 lights on in box but AIDA Relay had to water light
Investigation shows the cable between relay and interlock was broken, one wire had come loose from connector
Resoldered and now it works as usual

System powered up OK
All 16 FEEs respond to serial
All 16 FEEs have WR
All 16 FEEs show pulser ADC entries

Seems good!
ELOG V3.1.4-unknown