|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
DESPEC |
 |
|
Message ID: 421
Entry time: Fri May 6 09:31:41 2022
|
Author: |
TD NH |
Subject: |
Friday 6 May |
|
|
10:30 DAQ appears to have stopped
Attachment 2 - DSSSD bias and leakage current OK
Attachments 1, 3-5 - zero rate adc data items all FEE64s - note aida08 adc data item counter zero
RESET/SETUP/GO aida08 *only*
DAQ STOP *all* FEE64s
Attachment 6 - FEE64 temperatures OK
Attachments 7-23 - system wide checks - all OK
10:48 DAQ GO *all* FEE64s
all spectra zero'd
attachment 29 - ADC data items
n+n FEE64s aida02, 4, 6 & 8 c. 250k
p+n FEE64s aida07, 9 & 12 c. 100-150k, all other FEE64s < 100k
attachments 26 & 27 1.8.L spectra
aida01 peak width 112ch FWHM
aida02 peak width 485 ch FWHM
attachments 24 & 25 1.8.W spectra 20us FSR
attachment 30 - aida05 1*H spectra - aida05 asic#1 is producing HEC data
attachment 31 - aida05 also producing disc data
attachments 32 & 33 merger and tape server OK - 14MB/s to disk - no data to MBS currently?
18.36 Disconnect ribbon cabling from adaptor PCB - continue to observe HEC events from aida05 asic#1
Disconnect test inputs from adaptor PCB - continue to observe HEC events from aida05 asic#1
Conclude aida05 asic#1 has probably failed in operation and should be replaced. Other FEE64s are currently in CRYRING hall and measurement is in progress - ML says we should be able to access Monday. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|