|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
DESPEC |
 |
|
Message ID: 424
Entry time: Sun May 8 15:10:45 2022
|
Author: |
TD |
Subject: |
Sunday 8 May |
|
|
DSSSD bias and FEE64 power OFF during Ge install
Photographs of AIDA (triple) + DEGAS setup as of Sunday pm.
Attachments 1-4 side/front/oblique views - note AIDA snout droops and twists
Attachments 5 & 6 - position of the AIDA stand vertical adjustment threads (brass)
The asymmetry upstream-downstream pre-dates this setup. To lift the end of the snout clear of the of lower DEGAS detectors all 3x 1/4 turns clockwise (viewed from above) were applied to each of the four threads. |
|
|
|
|
|
|
|
|
|
|
|
|