|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
DESPEC |
 |
|
Message ID: 49
Entry time: Thu Apr 11 15:28:10 2019
|
Author: |
CA, OH, CB, TD |
Subject: |
Offline analysis of 290319 files R13 and R16 |
|
|
X projection of high energy channel ADC hits from R13 (attachment 1)
XY hit pattern from R13 (attachment 2)
-discontinuity observed
-possible timing issues or issues with Event Clustering
X projection of high energy channel ADC hits from R16 (attachment 3)
XY hit pattern from R16 (attachment 4)
-Beam was being diffused at this point, and tpcs were being calibrated.
-Gap between Y strips ~ 23 -> 30
High Energy Ey vs Ex plots from R13 and R16 (attachments 5 and 6 respectively) |
|
|
|
|
|
|
|
|
|
|
|
|