BB7 is still connected but not biased (same configuration as the previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased at 100V. The channel of the CAEN power supply #1 is disconnected but still biased at 100V. AIDA04 (chained to AIDA05) is biased via a shielded cable to an iseg NHQ 246L power supplied, biased at 101 V with 16 uA.
All the outside drain wires of bplast are now taped to the snout.
Attachment 1: AIDA05.1.8L --> FWHM 60 channels
Attachment 2: AIDA05.1.1L --> FWHM 51 channels
Attachment 3: AIDA05.1.4L --> FWHM 57 channels
Attachment 4: AIDA05.1.12L --> FWHM 65 channels
Attachment 5: AIDA05.1.15L --> FWHM 69 channels
Attachment 6: AIDA13.1.8L --> FWHM 277 channels, chosen because same place than AIDA05 but for the dowstream detector that is still biased with the CAEN module
Attachment 7: AIDA12.1.8L --> FWHM 88 channels, chosen because same place than AIDA05 but of the bottom of upstream detector that is still biased with the iseg module
Attachment 8: AIDA16.1.8L --> FWHM 133 channels, chosen because same place than AIDA05 of the bottom of dowstream detector that is still biased with the CAEN module. This curve has 2 humps |