AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC  ELOG logo
Message ID: 718     Entry time: Thu Jul 24 15:50:01 2025
Author: CC, MP, NK 
Subject: Check of BB7 impact 

HT of upstream AIDA from iseg, HT cable shielded, 100V, 17 uA. HT of downstream AIDA from CAEN, AIDA#0. Both channel 0 and 1 of CAEN are on, even though there is just one channel connected. DEGAS platform closed. The crates of BB7 and bplast have been put to the ground of the AIDA's structure (cupper sheet)

Attachment 1: TEST1: BB7 fully connected = 2 tiles of BB7 have been connected to the mesytec preamps. BB7 is not biased. The mesytec preamps have been fully connected and supplied but 6/8 black cables are not connected on the other side. 4X and 4Y are connected to the 2 FEBEX cards. The cables of BB7 right between the snout and the preamps are shielded.

AIDA05.1.8L --> FWHM 76-80 channels

Attachment 2: TEST2: BB7 fully disconnected

AIDA05.1.8L --> FWHM 71 channels

Attachment 3: TEST3: BB7 fully disconnected, TAMEX crate unbiased, BB7 NIM crate turned off

AIDA05.1.8L --> FWHM 67 channels

Attachment 4: AIDA01.1.0 --> FWHM 171 channels --> same detector, also biased with iseg but bad results

Attachment 1: Screenshot_from_2025-07-24_16-49-27.png  102 kB  Uploaded Thu Jul 24 16:52:11 2025  | Hide | Hide all
Screenshot_from_2025-07-24_16-49-27.png
Attachment 2: Screenshot_from_2025-07-24_17-03-44.png  101 kB  Uploaded Thu Jul 24 17:03:53 2025  | Hide | Hide all
Screenshot_from_2025-07-24_17-03-44.png
Attachment 3: Screenshot_from_2025-07-24_17-22-49.png  99 kB  Uploaded Thu Jul 24 17:23:00 2025  | Hide | Hide all
Screenshot_from_2025-07-24_17-22-49.png
Attachment 4: Screenshot_from_2025-07-24_17-29-38.png  109 kB  Uploaded Thu Jul 24 17:29:48 2025  | Hide | Hide all
Screenshot_from_2025-07-24_17-29-38.png
ELOG V3.1.4-unknown