|
|
|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
| DESPEC |
 |
|
|
Message ID: 743
Entry time: Fri Nov 7 12:30:30 2025
|
| Author: |
JB, GB, MP |
| Subject: |
Pulser walkthrough for source tests. |
|
|
13:30 We are going to do the pulser walkthrough for the the source tests.
We are wrapping the snout in some copper first to further establish a better connection with the ground.
2025Nov07-13.55.01 is a setting with 100 keV threshold across all FEEs.
We got the DAQ running, TEMPS ok and biased OK. We execute the pulser walkthrough as follow:
10x attenuation - 10V -> 1V in steps of 1 V
/lustre/despec/aida_sourcetest_2025/raw/
pulser_wt_10V - 10V
pulser_wt_9V - 9V
pulser_wt_8V - 8V
pulser_wt_7V - 7V
pulser wt_6V - 6V
pulser_wt_5V - 5V
pulser_wt_4V - 4V
pulser_wt_3V - 3V
pulser_wt_2V - 2V
pulser_wt_1V - 1V
Data taking stopped and we turn off the system to a safe state. |
|
|
|
|
|
|