| ID |
Date |
Author |
Subject |
|
747
|
Fri Jan 23 08:00:42 2026 |
MA, BA | Wed 12 May 00:00-08:00 |
| 引用: |
|
03:12系统检查
附件 1:当å‰
附件2:温度
附件3:费ç‡
æ—¶é’ŸçŠ¶æ€æµ‹è¯•结æœï¼šé€šè¿‡ 16 项,失败 0 项
状æ€ç†è§£å¦‚下
:状æ€ä½ 3:固件 PLL(用äºä»å¤–éƒ¨æ—¶é’Ÿç”Ÿæˆæ—¶é’Ÿï¼‰æœªé”定;
状æ€ä½ 2:始终为逻辑“1”
;状æ€ä½ 1:LMK3200(2) PLL 和时钟分é…芯片未é”定到外部时钟;
状æ€ä½ 0:LMK3200(1) PLL 和时钟分é…芯片未é”定到外部时钟。
å¦‚æœæ‰€æœ‰è¿™äº›ä½éƒ½æœªè®¾ç½®ï¼Œåˆ™å›ºä»¶è¿è¡Œä¸å¯é 。
æ ¡å‡†æµ‹è¯•ç»“æœï¼šé€šè¿‡ 16 项,未通过 0 项
如æœä»»ä½•æ¨¡å—æ ¡å‡†å¤±è´¥ï¼Œè¯·æ£€æŸ¥æ—¶é’Ÿçжæ€å¹¶æ‰“å¼€ FADC æ ¡å‡†å’Œæ§åˆ¶æµè§ˆå™¨é¡µé¢ï¼Œé‡æ–°è¿è¡Œè¯¥æ¨¡å—çš„æ ¡å‡†ã€‚
基准电æµå·®å€¼
aida05 故障 0x36ca : 0x36cb : 1
白兔错误计数器测试结æœï¼šé€šè¿‡ 15,失败 1
çŠ¶æ€æŠ¥å‘Šçš„å«ä¹‰å¦‚下:-
状æ€ä½ 3:White Rabbit è§£ç å™¨æ£€æµ‹åˆ°æ¥æ”¶åˆ°çš„æ•°æ®æœ‰è¯¯ï¼›
状æ€ä½ 2:固件记录了 WR é”™è¯¯ï¼Œæ—¶é—´æˆ³æœªé‡æ–°åŠ è½½ï¼›
状æ€ä½ 0:White Rabbit è§£ç å™¨æŠ¥å‘Šæ— æ³•ç¡®å®šæ¥è‡ª WR 的时间戳信æ¯ã€‚
基准电æµå·®å€¼
aida13 故障 0xa : 0xf : 5
FPGA 时间戳错误计数器测试结æœï¼šé€šè¿‡ 15,失败 1。
如æœè¿™äº›è®¡æ•°ä¸æœ‰ä»»ä½•一项被报告为错误,则
表示 ASIC 读å–系统检测到了时间滑移。
ä¹Ÿå°±æ˜¯è¯´ï¼Œä» FIFO 读å–çš„æ—¶é—´æˆ³ä¸æ¯”上一次读å–的时间戳更新。
è¿”å› 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
内å˜(KB) : 4 8 16 32 64 128 256 512 1k 2k 4k
aida01 : 22 5 7 2 1 2 2 3 3 3 6 : 36464
aida02 : 9 8 3 3 1 4 1 2 4 3 6 : 36916
aida03 : 5 2 6 2 0 3 2 3 3 3 6 : 36420
aida04 : 6 5 2 3 4 4 2 3 3 3 6 : 36800
aida05 : 17 6 6 2 2 4 1 3 2 4 6 : 37524
aida06 : 7 12 3 4 3 3 1 3 3 3 6 : 36460
aida07 : 17 11 5 1 3 3 3 2 3 3 6 : 36428
aida08 : 3 5 0 1 4 2 2 4 2 3 6 : 35924
aida09 : 27 6 4 2 0 2 2 2 3 3 6 : 35868
aida10 : 16 11 8 0 2 2 1 3 2 4 6 : 37272
aida11 : 15 2 2 3 1 4 3 4 2 3 6 : 36364
艾达12 : 1 6 4 3 1 3 2 4 2 3 6 : 35988
aida13 : 22 14 10 2 4 2 2 4 2 3 6 : 36264
aida14 : 26 10 4 3 2 1 1 3 3 3 6 : 36184
aida15 : 14 2 3 2 2 4 1 2 3 3 6 : 35896
aida16 : 7 5 4 0 2 4 2 3 2 3 6 : 35588
06:10 DSSD1 ç‡é«˜ï¼
附件 4
我给è€å…¬æ‰“了电è¯ï¼Œä»–èµ·æ¥å°±æ¥ä¿®å¥½äº† :)
æ®ä»–所说,问题出在澳大利亚è¯åˆ¸ä¸æŠ•资委员会(ASIC)的æŸä¸ªéƒ¨é—¨ï¼š
å…¶ä¸ä¸€å°ASIC HEC芯片è¿è¡Œå¼‚常ï¼å¼ºåˆ¶ASIC芯片检查其设置,使其æ¢å¤æ£å¸¸ï¼ˆè§é™„ä»¶9ï¼‰ã€‚æ¤æ“作大约在06:35完æˆã€‚
07:03 系统检查
附件 5 频谱速ç‡
附件 6 电å‹
附件 7 è´¹ç‡
附件 8 温度
系统时钟一切æ£å¸¸ï¼Œé™¤äº†
白兔
基准电æµå·®å€¼
aida05 故障 0x36ca : 0x36cb : 1
白兔错误计数器测试结æœï¼šé€šè¿‡ 15,失败 1
çŠ¶æ€æŠ¥å‘Šçš„å«ä¹‰å¦‚下:-
状æ€ä½ 3:White Rabbit è§£ç å™¨æ£€æµ‹åˆ°æ¥æ”¶åˆ°çš„æ•°æ®æœ‰è¯¯ï¼›
状æ€ä½ 2:固件记录了 WR é”™è¯¯ï¼Œæ—¶é—´æˆ³æœªé‡æ–°åŠ è½½ï¼›
状æ€ä½ 0:White Rabbit è§£ç å™¨æŠ¥å‘Šæ— æ³•ç¡®å®šæ¥è‡ª WR 的时间戳信æ¯ã€‚
FPGA
基准电æµå·®å€¼
aida13 故障 0xa : 0x14 : 10
FPGA 时间戳错误计数器测试结æœï¼šé€šè¿‡ 15,失败 1。
如æœè¿™äº›è®¡æ•°ä¸æœ‰ä»»ä½•一项被报告为错误,则
表示 ASIC 读å–系统检测到了时间滑移。
ä¹Ÿå°±æ˜¯è¯´ï¼Œä» FIFO 读å–çš„æ—¶é—´æˆ³ä¸æ¯”上一次读å–的时间戳更新。
|
|
|
746
|
Wed Jan 7 02:21:13 2026 |
BA, AA | Saturday 14 May |
| Quote: |
|
FEE64 module aida09 global clocks failed, 6
Clock status test result: Passed 13, Failed 1
Understand status as follows
Status bit 3 : firmware PLL that creates clocks from external clock not locked
Status bit 2 : always logic '1'
Status bit 1 : LMK3200(2) PLL and clock distribution chip not locked to external clock
Status bit 0 : LMK3200(1) PLL and clock distribution chip not locked to external clock
If all these bits are not set then the operation of the firmware is unreliable
FEE64 module aida02 failed
FEE64 module aida06 failed
FEE64 module aida09 failed
FEE64 module aida10 failed
FEE64 module aida13 failed
Calibration test result: Passed 9, Failed 5
If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun calibration for that module
White Rabbit error counter test result: Passed 14, Failed 0
Understand the status reports as follows:-
Status bit 3 : White Rabbit decoder detected an error in the received data
Status bit 2 : Firmware registered WR error, no reload of Timestamp
Status bit 0 : White Rabbit decoder reports uncertain of Timestamp information from WR
FPGA Timestamp error counter test result: Passed 14, Failed 0
If any of these counts are reported as in error
The ASIC readout system has detected a timeslip.
That is the timestamp read from the time FIFO is not younger than the last
|
|
|
745
|
Wed Nov 19 10:28:24 2025 |
JEL, JB | Analysis of AIDA from S100 experiment by JEL |
Analysis done by JEL of the AIDA daq with his own time-stitcher -- not the standard one used by DESPEC.
- Analysis of 168Dy:
-- Correlation efficiency and stopping layer of ion 168Dy in fully-stripped and hydrogen-like charge-state.
|
| Attachment 1: aidastop.pdf
|
|
|
744
|
Thu Nov 13 10:14:50 2025 |
JB, MP | Noise conditions after removal of bPlast cabling |
JB has removed unnecessary cables and items from the snout and platform:
- the bPlast cables and booster boards were removed
- crate below the AIDA frame was disconnected from the power supply
- BB7 cables were removed
- power supply for the booster boards was removed
We switch on the system and check the noise conditions.
We started up. BIAS OK. TEMPS OK.
Thresholds initially set to 100 keV.
Rates in all FEEs are > 200 kHZ. Attachment 6.
We then checked the pulser peak widths in aida14. --> 192 channels with 1 V 1x attenuation. at 700 keV threshold (attachment 3). At 100 keV threshold the peak width was significantly higher!!! ---> 385 channels (attachment 2)
We checked the rates in the FEEs with the 700 keV thresholds (attachment 11).
Furthermore, we checked the constant noise that appears to be present in the y FEEs aida02,04,06,08. This can be seen in attachment 8 and has been noted in previous elogs https://elog.ph.ed.ac.uk/DESPEC/727
Info on current status of ion catcher: vacuum system is ON, electronics is also on (RF ~2MHz) on the side opposite to the DESPEC setup |
| Attachment 1: Screenshot_from_2025-11-13_11-17-27.png
|
|
| Attachment 2: Screenshot_from_2025-11-13_11-41-48.png
|
|
| Attachment 3: Screenshot_from_2025-11-13_11-39-30.png
|
|
| Attachment 4: Screenshot_from_2025-11-13_11-34-29.png
|
|
| Attachment 5: Screenshot_from_2025-11-13_11-33-38.png
|
|
| Attachment 6: Screenshot_from_2025-11-13_11-33-13.png
|
|
| Attachment 7: Screenshot_from_2025-11-13_11-29-41.png
|
|
| Attachment 8: Screenshot_from_2025-11-13_11-53-18.png
|
|
| Attachment 9: Screenshot_from_2025-11-13_11-50-53.png
|
|
| Attachment 10: Screenshot_from_2025-11-13_11-47-30.png
|
|
| Attachment 11: Screenshot_from_2025-11-13_11-45-30.png
|
|
|
743
|
Fri Nov 7 12:30:30 2025 |
JB, GB, MP | Pulser walkthrough for source tests. |
13:30 We are going to do the pulser walkthrough for the the source tests.
We are wrapping the snout in some copper first to further establish a better connection with the ground.
2025Nov07-13.55.01 is a setting with 100 keV threshold across all FEEs.
We got the DAQ running, TEMPS ok and biased OK. We execute the pulser walkthrough as follow:
10x attenuation - 10V -> 1V in steps of 1 V
/lustre/despec/aida_sourcetest_2025/raw/
pulser_wt_10V - 10V
pulser_wt_9V - 9V
pulser_wt_8V - 8V
pulser_wt_7V - 7V
pulser wt_6V - 6V
pulser_wt_5V - 5V
pulser_wt_4V - 4V
pulser_wt_3V - 3V
pulser_wt_2V - 2V
pulser_wt_1V - 1V
Data taking stopped and we turn off the system to a safe state.
Initial analysis of the raw ADC spectra can be seen in attachment 4 & 5. |
| Attachment 1: Screenshot_from_2025-11-07_13-56-34.png
|
|
| Attachment 2: Screenshot_from_2025-11-07_13-45-30.png
|
|
| Attachment 3: Screenshot_from_2025-11-07_13-43-50.png
|
|
| Attachment 4: Screenshot_2025-11-07_192947.png
|
|
| Attachment 5: Screenshot_2025-11-07_193005.png
|
|
|
742
|
Fri Nov 7 10:47:29 2025 |
MP | 207Bi source test - data taking |
DAQ stopped at ~17.30 due to anydesk failure
> Restart AIDA
>
> aida06 took three attempts to boot today :(
>
> All system checks OK, ASICs aligned
>
> Run DAQ without merger - looks okay, all FEEs working
>
> When connecting to merger aida15 drops connection, solution restart merger
>
> Aida13 not sending data - do an ASIC check/load
>
> Finally all DAQs send data, merger is happy with all 16 FEEs
>
> Open run R6 on disk |
|
741
|
Thu Nov 6 12:58:09 2025 |
NH | 207Bi source test - data taking |
Restart AIDA
aida06 took three attempts to boot today :(
All system checks OK, ASICs aligned
Run DAQ without merger - looks okay, all FEEs working
When connecting to merger aida15 drops connection, solution restart merger
Aida13 not sending data - do an ASIC check/load
Finally all DAQs send data, merger is happy with all 16 FEEs
Open run R6 on disk |
| Attachment 1: Screenshot_from_2025-11-06_13-37-10.png
|
|
| Attachment 2: Screenshot_from_2025-11-06_13-40-37.png
|
|
| Attachment 3: Screenshot_from_2025-11-06_13-40-50.png
|
|
| Attachment 4: Screenshot_from_2025-11-06_13-55-58.png
|
|
| Attachment 5: Screenshot_from_2025-11-06_13-57-00.png
|
|
| Attachment 6: Screenshot_from_2025-11-06_13-57-43.png
|
|
|
740
|
Wed Nov 5 13:23:38 2025 |
JB, MP | 207Bi source test - FWHM tests |
14:10 started up the DAQ. HV and TEMPS OK.
Peak threshold with 1V pulser measured at ~ 175 ADC channels. Attachment 3.
14:24 DAQ stopped and detector debiased. We are going to do the following:
1. Cover the snout with a black cloth to check if it is light tight!
2. Disconnect the detector signal cable from the FEE64 adaptor card of aida14.
We put a black cloth cover over the snout, but pulser peak width remained the same ~161 ADC channel. Attachment 4,5.
We disconnected the cable from aida14 and the FWHM pf the pulser is ~15 ADC channels (as expected)
Wrapped the snout with more copper tape at the point where the PCB ground makes contact with the snout to ensure better contact, this seems to improve the FWHM to ~95 ADC channels |
| Attachment 1: Screenshot_from_2025-11-05_14-05-24.png
|
|
| Attachment 2: Screenshot_from_2025-11-05_14-05-14.png
|
|
| Attachment 3: Screenshot_from_2025-11-05_14-22-57.png
|
|
| Attachment 4: IMG_20251105_143017_hdr.jpg
|
|
| Attachment 5: Screenshot_from_2025-11-05_14-46-44.png
|
|
| Attachment 6: Screenshot_from_2025-11-05_15-20-45.png
|
|
| Attachment 7: Screenshot_from_2025-11-05_15-37-47.png
|
|
| Attachment 8: IMG_20251105_154023_hdr.jpg
|
|
|
739
|
Tue Nov 4 17:29:28 2025 |
MP | Bi207 source data, 700keV |
Anydesk has crashed. I am not able to set it up again. I switch off bias and fees
| Quote: |
|
Some FEES were not acquiring data for some reason we could not understand. We lowered the thresholds to 200 keV, then rose them again to 700 keV. It seems they are now acquiring. We start data taking again.
| Quote: |
|
- Bias and basic checks: the pulser FWHM appears to be ~170, which is the same we have obtained at the end of last week.
- Initialised the Merger and Tape server
- loading of settings: EXPERIMENTS/AIDA/2025Nov03-16.21.44
- slow comparator thresholds set to 700 keV for all X FEES
- y FEEs disabled in the discriminator
- Starting data taking with following details:
MIDAS data in: Bi207Centre_700
MBS data in /lustre/despec/aida_sourcetest_2025/raw started from lxg3138 on screen ('AIDAdaq')
We take data overnight in this configuration and continue the grounding checks tomorrow
|
|
|
|
738
|
Tue Nov 4 16:34:47 2025 |
MP, NH | Bi207 source data, 700keV |
Some FEES were not acquiring data for some reason we could not understand. We lowered the thresholds to 200 keV, then rose them again to 700 keV. It seems they are now acquiring. We start data taking again.
| Quote: |
|
- Bias and basic checks: the pulser FWHM appears to be ~170, which is the same we have obtained at the end of last week.
- Initialised the Merger and Tape server
- loading of settings: EXPERIMENTS/AIDA/2025Nov03-16.21.44
- slow comparator thresholds set to 700 keV for all X FEES
- y FEEs disabled in the discriminator
- Starting data taking with following details:
MIDAS data in: Bi207Centre_700
MBS data in /lustre/despec/aida_sourcetest_2025/raw started from lxg3138 on screen ('AIDAdaq')
We take data overnight in this configuration and continue the grounding checks tomorrow
|
|
|
737
|
Tue Nov 4 14:57:19 2025 |
MP | Bi207 source data, 700keV |
- Bias and basic checks: the pulser FWHM appears to be ~170, which is the same we have obtained at the end of last week.
- Initialised the Merger and Tape server
- loading of settings: EXPERIMENTS/AIDA/2025Nov03-16.21.44
- slow comparator thresholds set to 700 keV for all X FEES
- y FEEs disabled in the discriminator
- Starting data taking with following details:
MIDAS data in: Bi207Centre_700
MBS data in /lustre/despec/aida_sourcetest_2025/raw started from lxg3138 on screen ('AIDAdaq')
We take data overnight in this configuration and continue the grounding checks tomorrow |
| Attachment 1: Screenshot_from_2025-11-04_15-49-20.png
|
|
| Attachment 2: Screenshot_from_2025-11-04_15-33-11.png
|
|
| Attachment 3: Screenshot_from_2025-11-04_15-28-42.png
|
|
| Attachment 4: Screenshot_from_2025-11-04_15-28-35.png
|
|
|
736
|
Thu Oct 30 16:43:36 2025 |
MP, NH | Setup and data taking with 207Bi |
Data taking and DAQ stopped now (17.40)
| Quote: |
|
- Initialised the Merger and Tape server
- loading of settings: EXPERIMENTS/AIDA/2025Oct29-16.11.06
- aida16 very noisy (attachments 3,4), slow comparator thresholds was risen to 500 keV, until reducing its deadtime to 0
- y FEEs disabled in the discriminator (example in attachment 5)
- Starting data taking with following details:
MIDAS data in: Bi207Centre
MBS data in /lustre/despec/aida_sourcetest_2025/raw started from lxg3138 on screen ('AIDAdaq')
|
|