ID |
Date |
Author |
Subject |
Text |
 |
702
|
Tue Apr 8 08:52:39 2025 |
TD | AIDA grounding |
AIDA DSSSDs and FEE64-DSSSD cabling are electrically
isolated (by design) from snout, mounting |
 |
701
|
Tue Mar 11 11:53:18 2025 |
TD | Monday 10 March |
18.30 AIDA powered up for brief test
|
11x |
700
|
Sat Feb 22 12:35:38 2025 |
TD | Offline analysis data files R9_85-R9_199 (84Mo setting) |
Start 00:43 22.2.25 https://elog.gsi.de/despec/G-24-00302/57
AIDA data file R9_85
|
22x |
699
|
Thu Feb 20 17:06:42 2025 |
JB, CC, TD,MP | WR error for aida 13,14,15,16 | WR timestamp errors resolved after reseating
the HDMI cables to the MACB |
|
698
|
Wed Feb 12 10:46:01 2025 |
TD | Offline analysis data files S181 R4_351-396 | Analysis data files R4_351-396
|
25x |
697
|
Fri Jan 31 17:26:47 2025 |
CC, TD, MP | Friday 31 January contd. |
18.18 bPlas and BB7 installs complete
Restart AIDA DAQ, Merger, Tape Server |
16x |
696
|
Fri Jan 31 13:48:29 2025 |
JB | AIDA analysis from HI-DESPEC meeting 20.11.2024 | AIDA analysis and presentation by J. Bormans
for AIDA made in the HISPEC-DESPEC collaboration
meeting. |
|
695
|
Fri Jan 31 09:37:47 2025 |
CC, TD, MP | Friday 31 January | Implantation stack mounted - BB18(DS)-1000
+ bPlas + bPlas + 3x BB7(DS)-1000
|
26x |