AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Last 128 days  ELOG logo
New entries since:Sun Jan 26 01:19:43 2025
ID Date Author Subject Text Attachments
  702   Tue Apr 8 08:52:39 2025 TDAIDA grounding
AIDA DSSSDs and FEE64-DSSSD cabling are electrically
isolated (by design) from snout, mounting
 powerstax-ms1u_instructionmanua.pdf20250408_095624.jpg 
  701   Tue Mar 11 11:53:18 2025 TDMonday 10 March
18.30 AIDA powered up for brief test
 11x 
  700   Sat Feb 22 12:35:38 2025 TDOffline analysis data files R9_85-R9_199 (84Mo setting)
Start 00:43 22.2.25 https://elog.gsi.de/despec/G-24-00302/57
AIDA data file R9_85
 22x 
  699   Thu Feb 20 17:06:42 2025 JB, CC, TD,MPWR error for aida 13,14,15,16WR timestamp errors resolved after reseating
the HDMI cables to the MACB
  
  698   Wed Feb 12 10:46:01 2025 TDOffline analysis data files S181 R4_351-396 Analysis data files R4_351-396

 25x 
  697   Fri Jan 31 17:26:47 2025 CC, TD, MPFriday 31 January contd.
18.18 bPlas and BB7 installs complete 
      Restart AIDA DAQ, Merger, Tape Server
 16x 
  696   Fri Jan 31 13:48:29 2025 JBAIDA analysis from HI-DESPEC meeting 20.11.2024AIDA analysis and presentation by J. Bormans
for AIDA made in the HISPEC-DESPEC collaboration
meeting.
  
  695   Fri Jan 31 09:37:47 2025 CC, TD, MPFriday 31 JanuaryImplantation stack mounted - BB18(DS)-1000
+ bPlas + bPlas + 3x BB7(DS)-1000
 26x 
ELOG V3.1.4-unknown