AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  DESPEC, Last 128 days  ELOG logo
ID Date Author Subject Text Attachments
  747   Fri Jan 23 08:00:42 2026 MA, BAWed 12 May 00:00-08:00 




  
  746   Wed Jan 7 02:21:13 2026 BA, AASaturday 14 May 




  
  745   Wed Nov 19 10:28:24 2025 JEL, JBAnalysis of AIDA from S100 experiment by JELAnalysis done by JEL of the AIDA daq with
his own time-stitcher -- not the standard
one used by DESPEC.
 aidastop.pdf 
  744   Thu Nov 13 10:14:50 2025 JB, MPNoise conditions after removal of bPlast cablingJB has removed unnecessary cables and items
from the snout and platform:

- the bPlast cables and booster
 11x 
ELOG V3.1.3-7933898