AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Last 16 days  ELOG logo
  ID Date Author Subject Text Attachments
  718   Thu Jul 24 15:50:01 2025 CC, MP, NKCheck of BB7 impactHT of upstream AIDA from iseg, HT
cable shielded, 100V, 17 uA. HT
of downstream AIDA from CAEN, AIDA#0. Both
 Screenshot_from_2025-07-24_16-49-27.pngScreenshot_from_2025-07-24_17-03-44.pngScreenshot_from_2025-07-24_17-22-49.pngScreenshot_from_2025-07-24_17-29-38.png 
  717   Thu Jul 24 13:36:34 2025 CC, MP, NKAIDA05 connected and disconnected compared to AIDA09HT cable shielded, HT
of upstream AIDA from iseg, HT of downstream
AIDA from CAEN. Both channel 0 and 1 of CAEN
 10x 
  716   Thu Jul 24 10:28:04 2025 CC, NK, MPComparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8LBB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected
 8x 
ELOG V3.1.4-unknown