AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Last 16 days  ELOG logo
  ID Date Author Subject Text Attachments
  745   Wed Nov 19 10:28:24 2025 JEL, JBAnalysis of AIDA from S100 experiment by JELAnalysis done by JEL of the AIDA daq with
his own time-stitcher -- not the standard
one used by DESPEC.
 aidastop.pdf 
  744   Thu Nov 13 10:14:50 2025 JB, MPNoise conditions after removal of bPlast cablingJB has removed unnecessary cables and items
from the snout and platform:

- the bPlast cables and booster
 11x 
  743   Fri Nov 7 12:30:30 2025 JB, GB, MPPulser walkthrough for source tests. 13:30 We are going to do the pulser walkthrough
for the the source tests.
 Screenshot_from_2025-11-07_13-56-34.pngScreenshot_from_2025-11-07_13-45-30.pngScreenshot_from_2025-11-07_13-43-50.pngScreenshot_2025-11-07_192947.pngScreenshot_2025-11-07_193005.png 
  742   Fri Nov 7 10:47:29 2025 MP207Bi source test - data takingDAQ stopped at ~17.30 due to anydesk failure

  
ELOG V3.1.3-7933898