AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  DESPEC, Last 8 days  ELOG logo
  ID Date Author Subject Text Attachments
  749   Mon Apr 20 11:05:00 2026 TDSaturday 18 April 2026
Check of cooling water flow
- pressure (c. 7bar) and temperature (c.
 32x 
ELOG V3.1.3-7933898