AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DTAS  ELOG logo
Message ID: 4     Entry time: Wed May 15 06:40:16 2019
Author: Algora, Kiss, Nacher  
Subject: DTAS aligned and calibrated 

Signal cables (long cables, from preamp to digitizer) of channels 13 and 16 were changed. For the moment they have not been relabelled.

We assumed that it was not a HV supply or cable problem, since the anods were aligned and only the dynodes moved.

After changing the cables we realigned the dynodes and recalibrated all signals. Screen shots are attached.

File (root file) with the two sources (Co and Cs) saved as 201905151432_137Cs60Co.root

Configuration file: 20190515_Conf.xlsx

Rate with two sources: 52 kHz (Dynodes), 47 kHz (Anodes)

 

Attachment 1: Screenshot_from_2019-05-15_14-29-57.png  53 kB  Uploaded Wed May 15 07:41:33 2019  | Hide | Hide all | Show all
Screenshot_from_2019-05-15_14-29-57.png
Attachment 2: Screenshot_from_2019-05-15_14-30-57.png  55 kB  Uploaded Wed May 15 07:41:56 2019  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2019-05-15_14-31-25.png  53 kB  Uploaded Wed May 15 07:42:12 2019  | Hide | Hide all | Show all
Screenshot_from_2019-05-15_14-31-25.png
Attachment 4: Screenshot_from_2019-05-15_14-31-55.png  33 kB  Uploaded Wed May 15 07:42:28 2019  | Hide | Hide all | Show all
Screenshot_from_2019-05-15_14-31-55.png
ELOG V3.1.4-unknown