ID |
Date |
Author |
Subject |
Text |
|
12
|
Thu May 16 02:57:15 2019 |
Nacher, Algora | threshold dynode #13 increased | Threshold of dynode #13 changed from 500 to
700 because of a very high noise.
New configuration file: 20190516_Conf.xlsx |
|
100
|
Fri Jun 7 02:50:40 2019 |
SN, AA | test of 24Na | Start: 10:49
Stopt: 11:04
Lmd: 201906071049_24Na_AIDA_242.dlt |
7x |
105
|
Sat Jun 8 04:38:30 2019 |
Nacher, Algora, Tain, Molina | source top and bottom | 137Cs top and bottom test... to check differences
we positiones the source at the top and bottom
of AIDA respectively. |
|
106
|
Sun Jun 9 03:59:40 2019 |
Many | some cable changes | The cable of detector 8 was changed (long
cable) to reduce the noise. The cable (long)
of the reference detector was also changed. |
|
120
|
Sat Jun 15 18:15:08 2019 |
Pancho& Kike | run 9 | Shifters: Pancho & Kike
Degrader: none
|
9x |
121
|
Sat Jun 15 18:38:15 2019 |
Pancho & Kike | run 12 | Shifters: Pancho & Kike
Degrader: none
|
|
133
|
Sun Jun 16 19:18:15 2019 |
Ela, Victor | root files from run 30 to run 45 | |
6x |
122
|
Sat Jun 15 18:39:07 2019 |
Pancho & Kike | root files | 100Sn root files corresponding to runs 06,07,08
(190616_0030_100Sn_008.root) and runs 09,10,11
(190616_0230_100Sn_011.root) two hours each |
|
8
|
Wed May 15 09:57:54 2019 |
Nacher | root file with 60Co and 137Cs | For JL to play... |
|
124
|
Sat Jun 15 22:43:20 2019 |
Pancho & Kike | root file data 4:30 - 6:30 | corresponding to runs .dlt 15-17
|
|
123
|
Sat Jun 15 20:43:50 2019 |
Pancho & Kike | root file data 2:30 - 4:30 | corresponding to runs .dlt 12-14 |
|
128
|
Sun Jun 16 03:42:17 2019 |
Ela, Sonja, Victor | root file 8:30-10:30 | |
|
125
|
Sun Jun 16 00:52:27 2019 |
Ela, Sonja, Victor | root file 6:30-8:30 | |
|
139
|
Sun Jun 16 23:37:47 2019 |
Ela, Victor | root file 5:30-7:30 | |
|
135
|
Sun Jun 16 21:44:38 2019 |
Ela, Victor | root file 3:30-5:30 | |
|
138
|
Sun Jun 16 23:37:18 2019 |
Ela, Victor | root file 3:30-5:30 | |
|
134
|
Sun Jun 16 21:43:36 2019 |
Ela, Victor | root file 1:30-3:30 | |
|
130
|
Sun Jun 16 06:55:31 2019 |
Ela, Sonja, Victor | root file 12:30-14:30 | |
|
129
|
Sun Jun 16 04:44:05 2019 |
Ela, Sonja, Victor | root file 10:30-12:30 | The beam stopped a couple of times due to
problems before RRC |
|
137
|
Sun Jun 16 22:56:41 2019 |
Victor | rates modules in coincidence with F11 |
Module Rate cps Rate coin. F11 cps Difference
cps
|
|
|