ID |
Date |
Author |
Subject |
Text |
 |
35
|
Wed May 22 06:31:54 2019 |
A. Algora | 137Cs quick test of alignment | Start: 14:32
Stop: 14:37
Source: 137Cs |
|
36
|
Wed May 22 07:15:00 2019 |
A. Algora | 137Cs (4763) with AIDA in | Start: 15:15
Stop: 15:50
Lmd: Cs137_source_AIDA_201905221515_069.dlt |
|
37
|
Wed May 22 07:55:23 2019 |
A. Algora | Background with Aida in | Start: 15:55
Stop: 16:55
Lmd: Background_AIDA_201905221555_071.dlt |
|
38
|
Wed May 22 09:01:43 2019 |
A. Algora | 60Co (source CD 395) with AIDA in | Start: 17:00
Stop: 17:40
Lmd: Co60_source_AIDA_201905221700_072.dlt |
|
39
|
Wed May 22 09:44:57 2019 |
A. Algora | Background with AIDA in | Start: 17:46
Stop: 10:14 (next day)
Lmd: Background_AIDA_201905221746_075.dlt |
|
40
|
Thu May 23 02:48:29 2019 |
A. Algora | 137Cs short run with AIDA in | Start: 10:48
Stop: 10:58
Root: 201905231058_137Cs_with_Aida.root |
|
41
|
Thu May 23 03:06:15 2019 |
A. Algora | 133Ba source of red box too strong | The Ba source of the red box is too strong.
We can not use it. I need to identify the
other one, which does not appear to be in |
|
42
|
Thu May 23 04:18:57 2019 |
A. Algora | SY2527 fixed | Following the instructions of CAEN, the
SY2527 is working again. Some pushing, massaging
appear to solve the situation |
|
43
|
Fri May 24 06:25:14 2019 |
A. Algora | Background assymetry | Some pictures after the background during
the nigth. The front and back side looks
asymetric. To be checked again with a 137Cs |
  |
44
|
Fri May 24 07:57:51 2019 |
A. Algora | Lead shielding heigth increased | The aluminium plate of 3 cm thickness arrived
and the lead shielding was dismounted and
mounted again. We left a narrower hole in |
|
45
|
Fri May 24 08:33:52 2019 |
A. Algora | background, AIDA is out | Start: 16:35
Stop: 17:30
Rates: 1.5 kHz (Dynodes), 1.8 kHz |
|
46
|
Fri May 24 09:43:49 2019 |
A. Algora | 137Cs source, AIDA out, to check assymetry | Start: 17:43
Stop: 18:51
Root: 201905241851_137Cs.root |
|
47
|
Fri May 24 10:57:37 2019 |
A. Algora | 60Co, AIDA out, possitioned 5 mm deeper | Start: 18:58
Stop: 20:20
Lmd: 60Co_source_201905241858_095.dlt |
|
48
|
Fri May 24 12:32:48 2019 |
A. Algora | Background measurement, no sources around | Start: 20:32
Stop: 10:05
Lmd: Background_201905242032_111.dlt |
 |
49
|
Sat May 25 02:11:09 2019 |
A. Algora | 60Co source, red box, no sources around, No AIDA | Start: 10:27
Stop: 11:31
Root: 201905251131_60co.root |
 |
50
|
Sat May 25 03:42:12 2019 |
A. Algora | Background, no sources around, Aida out | Start: 11:42
Stop: 14:45
Lmd: Background_201905251141_182.dlt |
|
51
|
Sat May 25 06:53:35 2019 |
A. Algora | Background, no dlt files, last config file | Start: 14:53 (May 25)
Stop: 14: 37 (May 27)
Root: 201905271437_background.root |
|
52
|
Sat May 25 07:04:52 2019 |
A. Algora | Ancilliary card used channels until now | For the moment there are three channels
connected.
Channel 5 is AIDA plastic, |
|
53
|
Mon May 27 07:11:22 2019 |
A. Algora | detectors realigned with Cs | Small alignment corrections were needed,
of the order of 0.5-1V.
All detectors were realigned |
|
54
|
Mon May 27 07:15:06 2019 |
A. Algora | 137Cs run, AIDA out, source in the center | Start: 15:15
Stop: 15:31
Lmd: 137Cs_source_201905271514_187.dlt |
|