Wed May 22 06:31:54 2019, A. Algora, 137Cs quick test of alignment
|
Start: 14:32
Stop: 14:37
Source: 137Cs |
Wed May 22 07:15:00 2019, A. Algora, 137Cs (4763) with AIDA in
|
Start: 15:15
Stop: 15:50
Lmd: Cs137_source_AIDA_201905221515_069.dlt ..Cs137_source_AIDA_201905221515_070.dlt |
Wed May 22 07:55:23 2019, A. Algora, Background with Aida in
|
Start: 15:55
Stop: 16:55
Lmd: Background_AIDA_201905221555_071.dlt |
Wed May 22 09:01:43 2019, A. Algora, 60Co (source CD 395) with AIDA in
|
Start: 17:00
Stop: 17:40
Lmd: Co60_source_AIDA_201905221700_072.dlt ..Co60_source_AIDA_201905221700_074.dlt |
Wed May 22 09:44:57 2019, A. Algora, Background with AIDA in
|
Start: 17:46
Stop: 10:14 (next day)
Lmd: Background_AIDA_201905221746_075.dlt ..Background_AIDA_201905221746_081.dlt |
Thu May 23 02:48:29 2019, A. Algora, 137Cs short run with AIDA in
|
Start: 10:48
Stop: 10:58
Root: 201905231058_137Cs_with_Aida.root |
Thu May 23 03:06:15 2019, A. Algora, 133Ba source of red box too strong
|
The Ba source of the red box is too strong. We can not use it. I need to identify the other one, which does not appear to be in RIBF.
The counting rate was 74 kHz in the DTAS. |
Thu May 23 04:18:57 2019, A. Algora, SY2527 fixed
|
Following the instructions of CAEN, the SY2527 is working again. Some pushing, massaging appear to solve the situation |
Fri May 24 06:25:14 2019, A. Algora, Background assymetry  
|
Some pictures after the background during the nigth. The front and back side looks asymetric. To be checked again with a 137Cs source.
AIDA is in. Root file is saved, after one night.
Root: 201905241444_background_with_Aida.root |
Fri May 24 07:57:51 2019, A. Algora, Lead shielding heigth increased
|
The aluminium plate of 3 cm thickness arrived and the lead shielding was dismounted and mounted again. We left a narrower hole in it.
Special thanks to Tom, who helped with the hard physical work. |
Fri May 24 08:33:52 2019, A. Algora, background, AIDA is out
|
Start: 16:35
Stop: 17:30
Rates: 1.5 kHz (Dynodes), 1.8 kHz (Anodes) |
Fri May 24 09:43:49 2019, A. Algora, 137Cs source, AIDA out, to check assymetry
|
Start: 17:43
Stop: 18:51
Root: 201905241851_137Cs.root |
Fri May 24 10:57:37 2019, A. Algora, 60Co, AIDA out, possitioned 5 mm deeper
|
Start: 18:58
Stop: 20:20
Lmd: 60Co_source_201905241858_095.dlt ...60Co_source_201905241858_106.dlt |
Fri May 24 12:32:48 2019, A. Algora, Background measurement, no sources around 
|
Start: 20:32
Stop: 10:05
Lmd: Background_201905242032_111.dlt ...Background_201905242032_114.dlt |
Sat May 25 02:11:09 2019, A. Algora, 60Co source, red box, no sources around, No AIDA 
|
Start: 10:27
Stop: 11:31
Root: 201905251131_60co.root |
Sat May 25 03:42:12 2019, A. Algora, Background, no sources around, Aida out
|
Start: 11:42
Stop: 14:45
Lmd: Background_201905251141_182.dlt ..Background_201905251141_186.dlt |
Sat May 25 06:53:35 2019, A. Algora, Background, no dlt files, last config file
|
Start: 14:53 (May 25)
Stop: 14: 37 (May 27)
Root: 201905271437_background.root |
Sat May 25 07:04:52 2019, A. Algora, Ancilliary card used channels until now
|
For the moment there are three channels connected.
Channel 5 is AIDA plastic,
Channel 10 is the anode of the Ref detector |
Mon May 27 07:11:22 2019, A. Algora, detectors realigned with Cs
|
Small alignment corrections were needed, of the order of 0.5-1V.
All detectors were realigned |
Mon May 27 07:15:06 2019, A. Algora, 137Cs run, AIDA out, source in the center
|
Start: 15:15
Stop: 15:31
Lmd: 137Cs_source_201905271514_187.dlt .. 137Cs_source_201905271514_195.dlt |