Entry  Tue Jul 9 13:31:20 2019, CB, Tests with positive pulses 190709_PositivePulse.png190709_BaselineMean.png
According to Carl U. the DPP-PSA software is not meant to be used with negative pulses, and some of the
functions that are currently not working may be recovered fixing this issue.
Entry  Tue Jul 9 13:05:17 2019, CB, Jul 8 
Found VME crate yesterday reporting AC power failure. Workstation unresponsive.

Power cycled everything and restarted -> all OK.
Entry  Fri Jun 28 18:01:09 2019, CB, Long run to test DAQ stability 
Left DAQ running with pulser signal to attempt to reproduce error leading loss of communication with VME crate.
Write to disk DISABLED.
Entry  Wed Jun 26 17:04:07 2019, CB, New settings for internal CFD 1725_PosSig_Working.txt
Tried using settings attached to enable internal CFD.
Restored / DAQ Go. No waveforms.
MIDAS lost connection with the VME crate. Stopped DAQ. Workstation froze few seconds later.
Entry  Wed Jun 26 14:19:36 2019, CB, Analysis of R2 260619_R2Histo.png
Analysed first ~500 MB of R2_0 using sorting program

https://elog.ph.ed.ac.uk/EDI_PSA/2
Entry  Wed Jun 26 14:15:43 2019, CB, Waves to histogram program WavesToHisto.cpp
Wrote simple program to convert from waves to amplitude/energy histogram.
Program uses semi-gaussian filtering with RC=RC, simple pole zero correction and baseline restoration.
Entry  Tue Jun 25 11:51:00 2019, CB, Test run 4 
P9 3-alpha source
Hamamatsu Photodiode - bias = 15V
Cooknell preamplifier
Entry  Mon Jun 10 06:17:51 2019, CB, RG, AK, 3-6 June - first DAQ tests 
Tested performance of DAQ with following equipment

Hamamatsu photodiode (S3590-09)
Entry  Mon Jun 10 06:09:59 2019, CB, OH, Sorting program dataReader.tar.gz
Sort program written by Oscar, adapted from the RIKEN AIDA sort.
EDIT 26 Jun 2019 by CB - C++11 dependencies removed for SL6 compatibility
EDIT 28 Jun 2019 by CB - added histogram program mode
Entry  Mon Jun 10 03:26:41 2019, CB, DAQ setup, start & stop instructions 7x
(Updated to 10/01/2020)

If recovering from a crash, turn off the VME crate and the workstation.