Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
Run number : 107
Date : 12.11.17
Start time : 10.18
Stop time : 12:18:52
Trigger rate (MIDAS) : 5
Blocks written : 514
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 120k
3- E : 27
4- HI : 719
5- Pulser : 1
6- Clock : 969
Beam energy (MeV/u) : 4.4
Beam intensity (epA) :
Target : (CH2)n #16
Ladder position (mm) : 128.95*
HI Degrader foil (um) : 10 um Al
del_E voltage (V) : -40
del_E leakage (uA) : -0.78
E voltage (V) : -350
E leakage (uA) : -2.12
E_hi voltage (V) : -14
E_hi leakage (uA) : -2.71
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.25
Pressure (IMG1) (mbar) : 6.3E-06
Pressure (old gauge) (mbar) : 1.8E-05
Pressure (SEC) (mbar) : 3.5E-06
Temp (Chiller) deg : -10
Temp (chamber) deg : 5.8
Comments: Dimo cleans laser c. 10.20-10.35
====================================================
* target ladder reading by Tom 128.95, by Claudia 127.95 and Phil says ~128. True position depends how good the
marker is lining up with scale
|