AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 121     Entry time: Sun Nov 12 09:17:49 2017
Author: CLW, PJW, TD 
Subject: Run 107 
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
Run number			: 107
Date				: 12.11.17
Start time			: 10.18
Stop time			: 12:18:52
Trigger rate (MIDAS)	        : 5
Blocks written		        : 514

Run Scalers (approx rates)
0- Ungated                      : 4
1- Gated                        : 4
2- dE                           : 120k
3- E                            : 27
4- HI                           : 719
5- Pulser                       : 1
6- Clock			: 969

Beam energy (MeV/u)		: 4.4
Beam intensity (epA)	        : 
Target				: (CH2)n #16
Ladder position	(mm)	        : 128.95*
HI Degrader foil (um)		: 10 um Al

del_E voltage (V)		: -40
del_E leakage (uA)		: -0.78
E voltage (V)			: -350
E leakage (uA)		        : -2.12
E_hi voltage (V)		: -14
E_hi leakage (uA)		: -2.71

PA power (Up, positive)	(A)	: 1.55
PA power (Up, negative) (A)     : 0.55
PA power (Down, positive) (A)	: 0.8
PA power (Down, negative) (A)   : 0.25

Pressure (IMG1)	(mbar)	        : 6.3E-06
Pressure (old gauge) (mbar)     : 1.8E-05
Pressure (SEC)	(mbar)         	: 3.5E-06

Temp (Chiller)	deg	        : -10
Temp (chamber)	deg	        : 5.8

Comments: Dimo cleans laser c. 10.20-10.35
====================================================
 * target ladder reading by Tom 128.95, by Claudia 127.95 and Phil says ~128. True position depends how good the
marker is lining up with scale
 
ELOG V3.1.4-unknown