AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 18     Entry time: Thu Sep 14 08:37:27 2017
Author: Claudia 
Subject: Detector installation 

dE detector: 2083-9, 74 um thick, V_depletion=12V; V_operating=24 V

E detector:  3080-23, 1012 um thick, V_d=110; V_o=350 V

HI detector: 2410-23, 65 um; V_d=7 ; V_o=14 V

Connect bias cables 14,15,16 (dE,E,HI)

Quad Bias Supply ports 1,2,3 (dE,E,HI). There seems to be some offset voltage on them (V1=3V, V2=7V, V3=1V, V4=4V) Seems to go dowon when preamps are on.

Leakage Currents

dE:

dE Leakage Currents
Voltage Current (uA)
7 0.15
11 0.22
16 0.31
21 0.39
24 0.44

E:

Voltage Leakage Current (uA)
15 0.28
20 0.37
30 0.49
40 0.60
50 0.72
60 0.82
81 1.04
100 1.2
122 1.4
140 1.55
160 1.7
180 1.82
202 1.96
225 2.06
250 2.18
275 2.29
300 2.39
326 2.47
340 2.52
350 2.55

HI:

Voltage (V) Current (uA)
3 0.21
6 0.46
8 0.61
10 0.72
12 0.87
14 1.02

 

Attachment 1: depletion.pdf  3.823 MB  Uploaded Tue Oct 10 15:04:31 2017  | Hide | Hide all
depletion.pdf
Attachment 2: profile.pdf  3.811 MB  Uploaded Tue Oct 10 15:04:48 2017  | Hide | Hide all
profile.pdf
Attachment 3: resolution.pdf  3.818 MB  Uploaded Tue Oct 10 15:05:02 2017  | Hide | Hide all
resolution.pdf
Attachment 4: 3080-23.PDF  599 kB  Uploaded Tue Oct 10 15:05:26 2017  | Hide | Hide all
3080-23.PDF 3080-23.PDF 3080-23.PDF 3080-23.PDF 3080-23.PDF 3080-23.PDF 3080-23.PDF
Attachment 5: depletion.pdf  3.787 MB  Uploaded Tue Oct 10 15:05:51 2017  | Hide | Hide all
depletion.pdf
Attachment 6: profile.pdf  3.772 MB  Uploaded Tue Oct 10 15:06:06 2017  | Hide | Hide all
profile.pdf
Attachment 7: resolution.pdf  3.794 MB  Uploaded Tue Oct 10 15:06:22 2017  | Hide | Hide all
resolution.pdf
Attachment 8: S2_PINOUT.jpg  419 kB  Uploaded Tue Oct 10 15:08:15 2017  | Hide | Hide all
S2_PINOUT.jpg
ELOG V3.1.4-unknown