Header: Restart 5.0 MeV/u w/ CH2 after PS comes back (3 rings until the morning)
Ender: End
====================================================
Run number : 53
Date : 9 Nov 2017
Start time : 00:13:50
Stop time : 02:23:31
Trigger rate (MIDAS) : 2193
Blocks written : 31000
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : < 6 x 10^5 pps
Target : #2 CH2_16 (450~480 ug/cm^2)
Ladder position : 127.95
Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.005 uA
E voltage (V) : -350 V
E leakage (uA) : 1.82 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.3 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 8.05 x 10^-6 mbar
Pressure (old gauge) : 2.5 x 10^-5 mbar
Pressure (SEC) : 4.2 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0
Temp (chamber) : +5.5
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |