AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 79     Entry time: Fri Nov 10 01:29:51 2017
Author: ASM, MD, DK 
Subject: run 75 
Header: 4.7 MeV/u and C_09. PS back, but need to check how much beam actually there was before next issue
Ender: no beam at our sample; IHS cavity (part of normal conducting linac) tripped
====================================================
Run number			: 75
Date				: 10/11
Start time			: 02:20:11
Stop time			: 02:41:21
Trigger rate (MIDAS)      :  
Blocks written                : 77
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated                      :  2
1- Gated                           :  2
2- dE                                :  7
3- E                                  :  2
4- HI                                :  2
5- Pulser                          :  967
6- Clock                           :  0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy			: 4.7 MeV/u
Beam intensity		: 2.0-2.5 pA (in the beginning)
Target				: C_09 (Pos #5 - 82.44mm), chosen due to similar thickness as CH2_30+25, as used before
Ladder position		: 82.44
HI Degrader foil (um)     : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -32 
del_E leakage (uA)		: 0.8 
E voltage (V)			: -350 
E leakage (uA)	        : 1.75
E_hi voltage (V)		: -14 
E_hi leakage (uA)		: 0.88 
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive)	: 1.55A 
PA power (upstream, negative)   : 0.55A
PA power (downstream, positive)	: 0.8A
PA power (downstream, negative) : 0.28A 
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)		        : 6.8E-06
Pressure (old gauge)	        : 1.9E-05
Pressure (SEC)	           	: 3.8E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)		        : -10.1
Temp (chamber)		        : 5.4 (from before)
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: realised no beam on target after couple of minutes: normal conducting cavity tripped
Alex and Daid try to fix it.

====================================================
ELOG V3.1.4-unknown