AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  K40, Page 1 of 2  ELOG logo
ID Date Author Subjectdown
  14   Wed Sep 18 09:24:48 2024 CLWrun219173

Strips 1-16 dE.

Strip 8 is not working. Strip 16 is drowing the 10B peak in noise.  All others  look ok. The low energy peak around channel 300 in visible in some strips may be the Li recoil. The main peak around channel 800 is 10B(n,alpha_1) at around 1.3 MeV. The alpha_0 channel should be at around 1.8 MeV. There seem to be two small peaks above the alpha_1 peak. not sure why.

 

Plotted using:

 

void plotfile(){

    TFile *f=new TFile("run219173_B_ded.root","read");

 

    Char_t s[256];

    

    TH1D **hamps;

    hamps=new TH1D*[17];

    

    //creating histograms for each strip

    for(int u=0;u<=16;u++){

        sprintf(s, "hamp_%d",u);

        hamps[u]=(TH1D*)f->Get(s);

    }

    TCanvas *c=new TCanvas();

    c->Divide(4,4);

 

    for(int u=1;u<=16;u++){

        c->cd(u);

        c->SetLogy();

        hamps[u]->GetXaxis()->SetRangeUser(0,2000);

        hamps[u]->GetYaxis()->SetRangeUser(0,50);

        hamps[u]->DrawCopy();

  

    }

}

*********

 

Attachment 1: run219173.pdf
run219173.pdf
  3   Wed Jul 31 11:15:09 2024 CLW, Franciscoreference samples, 10B, LiF, blank

B10 and LiF samples have arrived at CERN.

There are 4 LiF sample, 4 Boron sample and one blank sample. All samples are attached to a square and are in good condition.

Attachment 1: Experiment_40K_Reference_Samples_1.jpeg
Experiment_40K_Reference_Samples_1.jpeg
Attachment 2: Experiment_40K_Reference_Samples_2.jpeg
Experiment_40K_Reference_Samples_2.jpeg
Attachment 3: B_Sample_2_1.jpeg
B_Sample_2_1.jpeg
Attachment 4: LiF_Sample_1_1.jpeg
LiF_Sample_1_1.jpeg
  Draft   Tue Oct 22 14:05:02 2024 Francisco García InfantesTransport of the 40K sample to CNA
  2   Thu Jun 20 12:41:22 2024 CLWTo Prepare

- new Kapton windows for chamber (underway, waiting for workshop)

- LiF and B samples from Daresbury: under production, will be shipped directly to CERN

- shorter flat cable: will try again to make a proper flat cable that is shorter. check with Tom

  26   Wed Jan 22 14:41:09 2025 SelinStrip Comparison for Li and K

1. LiF 2 strip comparison. This includes 12 runs.

2. LiF 3 strip comparison. This includes 4 runs.

3. K40 strip comparison. This shows 213 runs which have been grouped into 3 equally.

Attachment 1: Li2stripintegral.pdf
Li2stripintegral.pdf
Attachment 2: Li3stripintegral.pdf
Li3stripintegral.pdf
Attachment 3: Kstripintegral.pdf
Kstripintegral.pdf
  12   Mon Sep 16 09:23:36 2024 EmmanuelSpectra

Spectra after adjustments of the MWD and UserInput:

10B - Sample 1, 10B - Sample 2, LiF - Sample 2 and LIF - Sample 3.

We haven't seen the triton peak in any of the LIF - just noise and alpha.

The 10B alpha is also seen.

Attachment 1: 219134.pdf
219134.pdf
Attachment 2: 219140.pdf
219140.pdf
Attachment 3: 219142.pdf
219142.pdf
Attachment 4: 219149.pdf
219149.pdf
  22   Tue Oct 22 08:36:28 2024 Francisco García InfantesSaturday 19 intervention

During the intervention on Sunday there were some problems related to the detectors and the Dummy sample.

When we opened the chamber we realised that the detectors were not in place. It happened at the beggining of the experimental campaign while we were changing one of the references samples. As far as Emmanuel and I remenbered, the detectors were well fixed in the support, and we guess that the detectors moved as soon as we tried to open the chamber.

On the other hand, the dummy sample broke during the intervention. I attach a photo of the dummy sample.

About the 40K sample, it is in the vacuum box in good conditions.

Attachment 1: Dummy.jpeg
Dummy.jpeg
  20   Fri Sep 27 15:51:30 2024 CLWRunplan for last ~week of run: UNDER CONSTRUCTION

- run with LiF for a few hours with filters in the beam -- > this will help with the neutron energy calibration later

- run again LiF and 10B (not all samples, 2  LiF and 1 B are enough)

- run with the dummy sample

19th, 20th: LiF and B runs + runs with filter

21st dummy until 24th

 

  15   Wed Sep 18 10:08:58 2024 CLWQuick Plotting in terminal directly from root file

root -l run219167.root

TH1F *h=new TH1F("h","h",5000,0,5000)

EDET->Draw("amp>>h","detn==7")

 

--> plots amplitude in the histogram specified for detector number 7

  7   Fri Sep 13 11:34:01 2024 CLW, TDPulser

Screenshots of pulser signal  in DEED - 1-4 and EDET 1-4

 

Pulser settings:

- positive

- 0.5 V

- 20 Hz

Attachment 1: Screenshot_from_2024-09-13_12-32-55.png
Screenshot_from_2024-09-13_12-32-55.png
Attachment 2: Screenshot_from_2024-09-13_12-32-20.png
Screenshot_from_2024-09-13_12-32-20.png
  21   Mon Oct 21 17:44:11 2024 SelinProtons

This is the Excel sheet where the proton numbers and the runs are kept track of.

Attachment 1: Kprotons.xlsx
  4   Tue Aug 27 09:01:01 2024 CLWPrep Meeting Slides
Attachment 1: K40_prepmeeting.pptx
  18   Fri Sep 20 09:19:35 2024 CLWPhotos of Setup

Photos

  1   Tue Apr 16 08:57:12 2024 CLWNew Elog tab for 40K experiment

This is a new elog tab dedicated to the 40K(n,p) and (n,alpha) experiment. Things to be prepared before the run (start of run TBD):

- new almunised Kapton windows for chamber (Peter has ordered material)

- Lemo - BNC converters (most availanble, 10 new ones in my office)

- 10B and LiF reference samples: being prepared by P. Morrall in Daresbury

- 40K samples: one 40K (16% enriched) prepared by PSI, one highly enriched 40K sample will be produced by implantation at iThemba labs. Implantation will commence around May for about 6 weeks.

  13   Tue Sep 17 15:09:29 2024 FGI, CLWLiF sample rotated

In the scheenshot attached, the LiF sample is the same but the number of signals are different and the amplitude. The LiF is the #2.

 

Therefore, according to the Emmanuel's plots, we were putting the LiF sample away from the detectors.

 

The runNumber 219135 corresponds to the LiF sample forward to the detector, and the runNumber 219167 corresponds to the LiF sample away from the detector.

edit: added screenshot of strip 5 amplitude spectrum from run 219167 where triton and alpha peaks are well separated.

Attachment 1: Screenshot_from_2024-09-17_16-06-51.png
Screenshot_from_2024-09-17_16-06-51.png
Attachment 2: Screenshot_2024-09-17_at_16.20.51.png
Screenshot_2024-09-17_at_16.20.51.png
  16   Thu Sep 19 11:26:44 2024 SelinLi2 Comparison

1. The DEED amplitudes of Li2 run when the sample was not rotated.

2.  The DEED amplitudes of Li2 run when the sample was rotated. There are two clear peaks which indicate triton and alpha.

3. The EDET amplitudes of Li2 run when the sample was not rotated.

4. The EDET amplitudes of Li2 run when the sample was rotated.

 

Attachment 1: Li2_deed.pdf
Li2_deed.pdf
Attachment 2: Li2_deed_rot.pdf
Li2_deed_rot.pdf
Attachment 3: Li2_edet.pdf
Li2_edet.pdf
Attachment 4: Li2_edet_rot.pdf
Li2_edet_rot.pdf
  19   Fri Sep 20 09:58:28 2024 CLWK-40 run219189

Plot shows deposited energy (very rough calibration) vs Neutron energy (also very rough calibration). We expect the biggest resonances in the 40K(n,alpha) reaction at ~1 keV and 5 keV. There is an accumulation of counts at those neutron energies and around the expected Alpha energy (~3.5 MeV and ~1.8 MeV). 

In the proposal we expected in total ~2000 counts for those resonances for 4.5E18 protons. The plot shows 1/200 of the total statistics, so what we see is consistent with out estimation.

Attachment 1: K_40_dE.png
K_40_dE.png
  5   Fri Sep 13 08:12:04 2024 CLWHow to Edinburgh Chamber

A how to from last year, still relevant for this measurement (only the vacuum valve may have moved depending on the pump.

Attachment 1: HOW_TO.docx
  8   Fri Sep 13 14:38:09 2024 ClwFor next time

Things to organise for the future:

- plastic detecor mounts to electrically isolate detectors

- storage boxes

  9   Sat Sep 14 20:27:27 2024 EmmanuelFew adjustments and Log book

Wiith the adjustments:

voltage and leakage current in dE are 7 V and 0.03 µA,  respectvely. (W1-20, 3186-9, 20 um)

voltage and leakage current in E are 47 V and 0.04 µA,  respectvely. (W1-150 3458-4, 144 um)

A logbook is attached to record what happened in the first weekend of the campaign, so as to keep track of the changes we made, before the 40K sample gets in. It will be updated tomorrow 15th Sept., 2024.

Attachment 1: 40K_logbook.docx
ELOG V3.1.4-unknown