AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  MONNET  ELOG logo
Message ID: 2     Entry time: Thu Jan 29 16:16:46 2026
Author: Francisco García Infantes 
Subject: SetUp Status 

Here is a brief status update on the chamber setup.

At the moment, we have all the main components required for the experiment related to the chamber:

  • Vacuum chamber

  • 2 × MSL type W DSSSDs

  • 2 × MSL type W1 preamplifier units

  • Sample support, feedthrough, and short cables

  • 4 fans for the preamplifiers

  • 2 cases for the preamplifiers

  • Samples: 2 NaCl, 1 Boron, 1 Lithium, 1 dummy, and 1 empty

  • Bias voltage cables for the preamplifiers

Please find attached some photos showing the current setup.

The only remaining item to be installed is the fans, which will be connected on Monday, February 2nd. We may also try installing the detectors soon; we have already tested the fit with a spare detector, and it fits well.

Additionally, the distance from the center still needs to be measured so that we can precisely determine the sample position from outside the chamber. We will need to add a reference mark for this.

Finally, if we decide to position the detectors further away from the beam, we will require longer bias voltage cables for the preamplifiers.

Please let me know if you need any further information.

 

Attachment 1: Preamp_Modules.jpeg  378 kB  Uploaded Fri Jan 30 15:43:04 2026  | Hide | Hide all
Preamp_Modules.jpeg
Attachment 2: Chamber_In.jpeg  196 kB  Uploaded Fri Jan 30 15:43:16 2026  | Hide | Hide all
Chamber_In.jpeg
Attachment 3: From_Chamber.jpeg  224 kB  Uploaded Fri Jan 30 15:43:23 2026  | Hide | Hide all
From_Chamber.jpeg
Attachment 4: Voltage_Cable.jpeg  286 kB  Uploaded Fri Jan 30 15:43:34 2026  | Hide | Hide all
Voltage_Cable.jpeg
ELOG V3.1.3-7933898