AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF  ELOG logo
Message ID: 2     Entry time: Mon Oct 12 11:50:52 2015
Author: Sarah Lonsdale 
Subject: 05/10/15 Pulser, Wiring information and DAQ initial set up 

600mV in 50ohm coax with 25 hz pulser (positive signal) - see 2015-10-05_15.19.54.jpg and 2015-10-05_15.22.46.jpg



Leakage currents on detectors:

In air
10v: 0.03 micro amp det 1 leakage -dE
132v: 0.47micro amp det 2 leakage- E det

In vacuum
DE 0.04 micro amp
E 0.46 micro amp

Same size of signal at ADC hence 50 ohms coaxial.

The following channel explanations refer to cables at control area (not vault) see (
2015-10-05_15.19.54.jpg) for full wiring information.


dE det= DEED 0 to -2V full scale, Lower limit 1800mV, Threshold 0V, thresh neg, pre 1024, post 2048, 20ms window, sample rate 225 MS/s
- L6D6 A = de 4
- L6D6 B = de 5
- L6D6 C = de 6
- L6D6 D = de 7
- LaBr 3 = de 8
- 21 = de 9

E det front= EFED 0 to -2V full scale, Lower limit 1800mV, Threshold 0V, thresh neg, pre 1024, post 2048, 20ms window, sample rate 225 MS/s
- 10 = Ef 3
- 12 = Ef 4
- 13 = Ef 5
- 14 = Ef 6
- 15 = Ef 7

E det back= EBED 0 to +2V full scale, Lower limit -200mV, Threshold 0V, thresh pos, pre 1024, post 2048, 20ms window, sample rate 225 MS/s (except EBED 5,6,7 which MUST be 900MS/s due to beam pick up signal)
- 16 = Eb 3
- 18 = Eb 4
- 20 = Eb 5
- 38 = Eb 6
- 40 = Eb 7

Run number 203385 on https://project-ntof.web.cern.ch/project-ntof/eRunbookEAR2.php

Attachment 1: 2015-10-05_15.19.54.jpg  699 kB  | Hide | Hide all
2015-10-05_15.19.54.jpg
Attachment 2: 2015-10-05_15.20.24.jpg  1.409 MB  | Hide | Hide all
2015-10-05_15.20.24.jpg
Attachment 3: 2015-10-05_15.22.39.jpg  918 kB  | Hide | Hide all
2015-10-05_15.22.39.jpg
Attachment 4: 2015-10-05_15.22.46.jpg  1.392 MB  | Hide | Hide all
2015-10-05_15.22.46.jpg
ELOG V3.1.4-unknown