AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF  ELOG logo
Message ID: 30     Entry time: Thu Oct 6 09:34:30 2022
Author: Claudia 
Subject: Test setup Photos and cabling 

Setup 5.10.22

dE 20 um (ID 2837-33) and 494 um double sided (ID 1194-9)

46 channels (2 connectors missing)

LiF4 in beam 

dE: Big flat cables from preamp 22 and 23 into 1A and 1B

E: from preamp 24+25 go into 2A, 2B and 3A 3B

LEMO converter box: Cable 1: dE

                                   Cable 3: E n+n

                                  unlabeled cable: E p+n

E detector voltage: -133 V, leakage current -0.53 micro-Amp

dE detector voltage -22 V, leakage current -0.03 micro-Amp

For the E detector one of the edge p+n strip bond-wires is suspected broken.

Attachment 1: 20221005_174742.jpg  2.886 MB  Uploaded Thu Oct 6 10:45:10 2022  | Hide | Hide all
20221005_174742.jpg
Attachment 2: 20221005_174759.jpg  2.800 MB  Uploaded Thu Oct 6 10:45:48 2022  | Hide | Hide all
20221005_174759.jpg
Attachment 3: 20221005_184752.jpg  3.201 MB  Uploaded Thu Oct 6 10:46:16 2022  | Hide | Hide all
20221005_184752.jpg
Attachment 4: 20221005_184801.jpg  3.481 MB  Uploaded Thu Oct 6 10:47:03 2022  | Hide | Hide all
20221005_184801.jpg
Attachment 5: 20221005_174742.jpg  2.886 MB  Uploaded Thu Oct 6 10:48:05 2022  | Hide | Hide all
20221005_174742.jpg
ELOG V3.1.4-unknown