AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF  ELOG logo
Message ID: 63     Entry time: Tue Aug 15 10:17:39 2023
Author: TD, NS 
Subject: RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August 
On the morning of Monday 14 August 2x RAL108 +/-15V PSUs were borrowed from the Edinburgh equipment in the ISOLDE hall to check whether the same transient 
noise is observed at the +/-15V PSU outputs.


PSU #2 Farnell MX2

Setup - attachment 1

DSO ch#1 +15V AC/1M, ch#2 -15V AC/1M - y: 50mV/div x: 1us, 500ns, 250ns & 25us/div - attachments 2-5



PSU #1 Coutant HSC15-3.0

Setup - attachment 6

DSO ch#1 +15V AC/1M, ch#2 -15V AC/1M - y: 50mV/div x: 25us/div - attachment 7


Conclusion

Observe same amplitude and HF structure with all 3x RAL108 +/-15V PSUs
Attachment 1: 20230814_083448.jpg  2.469 MB  Uploaded Tue Aug 15 11:20:15 2023  | Hide | Hide all
20230814_083448.jpg
Attachment 2: 20230814_083549.jpg  2.534 MB  Uploaded Tue Aug 15 11:21:12 2023  | Hide | Hide all
20230814_083549.jpg
Attachment 3: 20230814_083556.jpg  2.403 MB  Uploaded Tue Aug 15 11:23:01 2023  | Hide | Hide all
20230814_083556.jpg
Attachment 4: 20230814_083601.jpg  2.395 MB  Uploaded Tue Aug 15 11:25:05 2023  | Hide | Hide all
20230814_083601.jpg
Attachment 5: 20230814_083445.jpg  2.670 MB  Uploaded Tue Aug 15 11:28:43 2023  | Hide | Hide all
20230814_083445.jpg
Attachment 6: 20230814_083323.jpg  2.464 MB  Uploaded Tue Aug 15 12:04:12 2023  | Hide | Hide all
20230814_083323.jpg
Attachment 7: 20230814_083319.jpg  2.444 MB  Uploaded Tue Aug 15 12:06:53 2023  | Hide | Hide all
20230814_083319.jpg
ELOG V3.1.4-unknown