AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 104     Entry time: Sat May 9 03:50:56 2015
Author: TD & CG 
Subject: Saturday 9 May 2015 
Gzip'd tar file of /MIDAS/DB - attachment 1
Scan of AIDA logbook - attachment 2

AIDA FEE64 power OFF
JUlabo FL11006 chiller OFF
USB ac mains control OFF
Mains power disconnected from ac mains network to AIDA.
2x RJ45 network cables from NetGear Gbit switches to AIDA
server aidas1 disconnected and rolled up.

AIDA withdrawn from in-beam position within EURICA.
AIDA stand, Julabo FL11006 chiller and ac mains transformer
moved downstream from EURICA. 

AIDA snout removed and DSSSD stack dis-assembled.
Attachment 1: MIDAS_DB_090515.tar.gz  30 kB
Attachment 2: aida_may2015-0001.compressed.rotated.pdf  8.527 MB  Uploaded Sat May 9 05:08:06 2015  | Hide | Hide all
aida_may2015-0001.compressed.rotated.pdf aida_may2015-0001.compressed.rotated.pdf aida_may2015-0001.compressed.rotated.pdf aida_may2015-0001.compressed.rotated.pdf aida_may2015-0001.compressed.rotated.pdf aida_may2015-0001.compressed.rotated.pdf aida_may2015-0001.compressed.rotated.pdf aida_may2015-0001.compressed.rotated.pdf
ELOG V3.1.4-unknown