|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
AIDA |
 |
|
Message ID: 370
Entry time: Wed Oct 5 07:29:29 2016
|
Author: |
CG & TD |
Subject: |
Wednesday 5 October (inc AIDA+BRIKEN photos) |
|
|
14.30 Adjusted and checked insertion of AIDA snout into BRIKEN (CH2)n moderator.
up-down AIDA snout appears centred (@ (CH2)n centre) and tracks into (CH2)n moderator with no
significant vertical movement
left right AIDA snout appears centred (@ (CH2)n centre) and tracks into (CH2)n moderator with ~3mm
horizontal movement left to right (looking upstream)
15.28 DSSSD bias/leakage current OK - see attachments 1-2
FEE64 temperatures OK - see attachment 3
B2F/F11 temperature +24.8 deg C, d.p. +11.8 deg C, RH 44.4%
16.00 Power off to place ac mains distribution unit between AIDA and BRIKEN
18.34 Power up PCS request for remote data/diagnostics collection |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|