|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
AIDA |
 |
|
Message ID: 380
Entry time: Sun Oct 9 11:47:34 2016
|
Author: |
CG, TD |
Subject: |
Sunday 9th October |
|
|
12.30 Following scheduled power outages of October 8
power up AIDA and Julabo FL11006 recirculating chiller
Julabo FL11006 set point +20 deg C
Temperature +25.3 deg C, d.p. +10.6 deg C, RH 39.3%
boot aidas1
aidas1 filesystem checks (fsck) run from c. 12.30 to 15.58
System wide checks OK *except* nnaida21 failed ADC calibration
16.55 DAQ starts (no data transfer)
ASIC settings 2016Sep02-18.17.01
slow comparator threshold 0x10 -> 0x0a
TS_SYNC_PHASE 0
DSSSD bias & leakage current OK - see attachments 8 & 9
FEE64 temperatures OK - see attachment 7
17.30 DAQ stops
DSSSD bias off
AIDA withdrawn from (CH2)n moderator
DSSSD bias on
17.40 DAQ starts
19.15 Noticed DAQ stopped producing SYNC pulses at some point.
A reload of the run control tab sees them all as going still, but only 20% are reporting any SYNC output in the stats page.
All FEEs have failed the SYNC errors since baseline check and the values reported by the SYNC pulses received tests vary
by +- 3 of a central value.
See attachments 1-6.
The merger and tape server were not set up before this run and are not currently running.
TS_SYNC phase changed from 0 -> 1 and ReSYNC
22.20 DAQ OK
AIDA SYNCs OK
All system-wide checks OK *except* nnaida21 fails ADC calibration (no change) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|