AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 41     Entry time: Fri Feb 20 10:04:29 2015
Author: CG, AE, TD 
Subject: Fri 20th progress 

20/02/15

1400: Measured leakage current as function of bias V for the Caen 1419B high voltage supply and detector BB18 2977-20. (see attachment #1)

1500: Modified MACB installed and connected to BELEN and RIBF DAQs (see attachment #2 for signal flow diagram).

          Increased noise in several nnaida, possibly due to grounding issues introduced by inclusion of modules for other DAQs.

Attachment 1: bias_voltage_vs_leakage_current_for_caen_n1419b_and_detector_bb18_2977-20(2).png  43 kB  | Hide | Hide all
bias_voltage_vs_leakage_current_for_caen_n1419b_and_detector_bb18_2977-20(2).png
Attachment 2: 2015-02-20_20.27.57.jpg  1.528 MB  Uploaded Sat Feb 21 06:07:06 2015  | Hide | Hide all
2015-02-20_20.27.57.jpg
ELOG V3.1.4-unknown