|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
AIDA |
 |
|
Message ID: 429
Entry time: Mon Nov 7 23:15:14 2016
|
Author: |
TD, CG, OH |
Subject: |
Tuesday 8 November |
|
|
08.15 DAQ found stalled
Soft reset OK
DSSSD bias & leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
Ambient temperature +25.0 deg C, d.p. -0.2 deg C, RH 19.2%
System-wide checks OK *except* clock status errors for naida5, 7, 8, 15, 16
ASIC settings 2016Nov07-23.03.06
BNC PB-4
amplitude 90,000
frequency 25Hz range
08.30 AIDA moved into (CH2)n moderator
08.46 Start DAQ (R141)
BNC PB_4 pulser OFF
Background run with AIDA inside (CH2)n moderator
Statistics - good events - attachment 4
per FEE64 1.8.W spectra - see attachments 5-8
09.00 DAQ stops OK
System wide checks OK
BNC PB-4 pulser ON
amplitude 90,000
x5 attenuator IN
t_r 50ns tau_d 50us
polarity -, delay MIN, tail pulse
frequency 25Hz range
14.51 Bias and leakage voltages good (Attachments 9 and 10)
16.30 Ca beam delivered to F11 around 16:30.
PB shield still in place up stream of AIDA.
DAQ running in no storage mode. Leakage currents @ 16:40 in attachments 11+12.
18.28 DAQ stopped during LN2 fill cycle. Soft reset completed.
Will wait 15mins for cycle to complete and the start new run.
18.34 Ca beam stopped.
19.07 Run R146 started on no storage mode.
20.11 DAQ found stopped.
Unable to perform soft reset. Power cycling FEEs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|