To do (roughly in order):
- Move shipped boxes down from Gabor's office to the experimental area. Check contents. Should include:
- 3x 3Tb HDD
- NIM floating HV supply
- 2x Si detector boxes, containing MSL type BB18 detectors 3131-9 + 3131-11 and 3058-9 + 3058-25
- flex circuit tester
- misc items including Al plates, grub nuts etc.
- Put everything back into working positions @ F11.
- Put computer table back to normal. Turn on/check aidas1.
- Reconnect power to chiller. Check water levels, fill if needed. Turn on and check for leaks.
- Install PSUs, USB and network switches in new AIDA base.
- Set up Raspberry Pi.
- Check modified PSU voltages.
- Reconnect FEE64s (power/network/HDMI). Label everything.
- Power on. Check
- Basic pusler test to check function and server. Confirm FWHMs are as expected.
Late Monday or on Tuesday:
- Talk to Shunji re. AIDA/BRIKEN + EURICA setup requirements.
- Install Al/Si accordingly.
- Complete AIDA build with snout, kaptons etc.
- Acquire sources (Am/Bi) for source test ------> Speak to Gabor first thing about this.
|