AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 729     Entry time: Thu Jun 28 02:19:30 2018
Author: OH 
Subject: Thursday 28th June 
10:18 Bias and leakage currents ok - attachment 1
      FEE Temperatures ok
      System wide checks all ok
      Currently on file R9_63
      Humidity 43.3%, Temperature 25.1C, Dew Point +11.8C
      Filler level ok

12:51 Bias and leakage currents ok - attachment 2
      FEE Temperatures ok
      System wide checks all ok
      Currently on file R9_64

19:20 Bias and leakage currents - attachment 3
      FEE temperatures ok
      System wide checks all ok
      Currently on file R9_65
      ASIC 2 is still missing from FEE29. ASIC checks earlier in the afternoon have failed to recover it. -
attachment 4
      This ASIC has been observed to be working since it was installed last week. Once the alpha run is over
further attempts
      will be made to test it is back.
Attachment 1: 180628_1018_bias.png  22 kB  Uploaded Thu Jun 28 03:27:46 2018  | Hide | Hide all
180628_1018_bias.png
Attachment 2: 180628_1249_bias.png  21 kB  Uploaded Thu Jun 28 05:53:28 2018  | Hide | Hide all
180628_1249_bias.png
Attachment 3: 180628_1922_FEE29ASIC2.png  86 kB  Uploaded Thu Jun 28 12:24:15 2018  | Hide | Hide all
180628_1922_FEE29ASIC2.png
ELOG V3.1.4-unknown