|
ID |
Date |
Author |
Subject |
Text |
 |
|
529
|
Tue Dec 6 06:38:46 2016 |
TD, Updated Patrick | CAEN N1419 HV output common mode noise |
There appears to be significant common mode
noise on the output of the
|
9x |
|
528
|
Tue Dec 6 02:30:35 2016 |
TD | Report - low - significant variation in FEE64 boot times |
Not something we were not aware of already
but /var/log/messages illustrate the issue.
|
|
|
527
|
Tue Dec 6 02:20:29 2016 |
TD | Tuesday 6 December | 11.20 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures OK - see attachment |
   |
|
525
|
Mon Dec 5 11:53:26 2016 |
TD | MACB test |
MACB configuration can be found at https://elog.ph.ed.ac.uk/AIDA/357
|
42x |
|
524
|
Mon Dec 5 10:51:08 2016 |
TD | Monday 5 December | 19.50 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures HIGH - see attachment |
    |
|
523
|
Sun Dec 4 05:46:42 2016 |
TD | SyncCheck RIBF03R1 & RIBF123R1 commissioning tests archived |
The SyncCheck etc software used for the RIBF123R1
and RIBF03R1 commissioning
|
|
|
522
|
Sun Dec 4 04:05:24 2016 |
TD | Report - low - DAQ SETUP sometimes produces Javascript error |
DAQ SETUP sometimes produces Javascript error
instead of a pop-up displaying
|
|
|
521
|
Sun Dec 4 03:44:12 2016 |
TD | Sunday 4 December | 12.45 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures OK - see attachment |
16x |
|
520
|
Sat Dec 3 10:49:36 2016 |
TD | Saturday 3 December | 19.48 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures OK - see attachment |
  |
|
519
|
Fri Dec 2 09:58:54 2016 |
DK | Simple PID with LISE++ | I wrote this LISE++ file based on the Takechi
.lpp modified by AE for 77Ni, 78Ni, 76Ni.
|
  |
|
518
|
Fri Dec 2 09:47:58 2016 |
DK | F8 targets | F8 target measurements, for posterity.
Plastic: ~39 to 40 mm
|
|
|
517
|
Fri Dec 2 09:47:45 2016 |
DK | F8 targets | F8 targets, for posterity.
Plastic: 39~40 mm
|
|
|
516
|
Fri Dec 2 08:23:28 2016 |
TD | Offline analysis of R48_9 | Analysis of background, pulser off
S O R T C O M P L E T E ..... Fri Dec |
   |
|
515
|
Fri Dec 2 06:41:25 2016 |
DK | Benchmarks for compression | R45_17 as the test file, which was closed
at 9.02 AM Friday, December 2nd at the end
of the official parasitic
|
|
|
514
|
Thu Dec 1 16:01:10 2016 |
CG, PV | Friday 2 December | 00.07 BigRIPS data file 1135
01.07 BigRIPS data file 1136.
|
14x |
|
513
|
Thu Dec 1 10:58:54 2016 |
PV, TD, Liu | Implantation profile in AIDA , after switch back to the previous ZDS setting (AIDA 43_63 to 43_71, bigrips run 1129) | |
  |
|
512
|
Thu Dec 1 09:46:06 2016 |
TD | Offline analysis of R43_59 | Variable degrader setting is now #2 +
#3: 0.3 mm W + 1.0 mm W [+2 mm Al]
Centre ZDS @ 40Mg
|
9x |
|
511
|
Thu Dec 1 08:13:06 2016 |
PV,Liu, TD | Implantation profile in AIDA , after changing the ZDS setting to center at 41Al, AIDA 43_ 33 to 43 | Bigrips run 1127
AIDA run 43_ 33 to 43 |
  |
|
510
|
Thu Dec 1 02:25:41 2016 |
DK | Offline analysis of R42_32 | Offline analysis of AIDA R42_32.
Degrader condition of F11 is with the same |
6x |
|
509
|
Thu Dec 1 00:21:08 2016 |
DK | Offline analysis of R42_7 | Checking that the implantation is still
reasonable after LN2 fill recovery.
Degrader condition is 8. + 0.2 |
    |