Sun May 28 10:25:11 2017, TD, Analysis of RIBF123R1/R23
|
|
Sun May 28 09:55:11 2017, PV, ADC offset value from pulser walkthrough run May2017/R28 R29   
|
ADC offset calculation using data from pulser walkthrough runs, see:
https://elog.ph.ed.ac.uk/AIDA/603
|
Sun May 28 09:20:29 2017, TD, Analysis of RIBF123R1/R21
|
|
Sun May 28 02:16:04 2017, TD, CB, Sunday 28 May 16x
|
10.15 DAQ continues OK
Current file May2017/R31_239
|
Sat May 27 05:38:39 2017, CB, TD, OH, Saturday 27 May 9x
|
13.38 DAQ continues OK
Current file May2017/R27_49
|
Fri May 26 05:19:40 2017, TD, Offline analysis RIBF123R1/R23_44 to R23_70
|
Observe same noise structures to https://elog.ph.ed.ac.uk/AIDA/600
|
Fri May 26 02:20:42 2017, CB, OH, NN, Friday 26 May 15x
|
10.20 DAQ continues OK
Current file May2017/R27_22
|
Thu May 25 03:03:38 2017, TD, Offline analysis of R23_91 to R23_115 13x
|
Offline analysis of RIBF123R1_91 to R23_115
See https://elog.ph.ed.ac.uk/AIDA/583 & https://elog.ph.ed.ac.uk/AIDA/594
|
Thu May 25 02:11:04 2017, CB, TD, Thursday 25 May 10x
|
10.10 DAQ continues OK
Current file May2017/R26_17
|
Wed May 24 13:39:12 2017, Patrick Coleman-Smith, Examination of Console Logs -- and a couple of reminders
|
I have tarred and zipped all 24 logs and shipped them back to the UK. Now I can browse through them.
Studying the "panics" :=
nnaida17 has one which is an NFS mount failure. |
Wed May 24 14:51:06 2017, Patrick Coleman-Smith, Examination of Console Logs -- and a couple of reminders
|
Quote:
I have tarred and zipped all 24 logs and |
Wed May 24 15:58:53 2017, Patrick Coleman-Smith, Examination of Console Logs -- and a couple of reminders
|
Quote:
|
Wed May 24 06:33:19 2017, TD, Analysis of RIBF123R1/R23_44, R23_91 & R25_142   
|
Álvaro Tolosa Delgado reports observation of c. 1s 'oscillations' in implant-decay time spectra - see below
|
Wed May 24 06:12:48 2017, TD, Lead bricks removed from BRIKEN aperture for source tests - AIDA NOT SHIELDED FROM BEAM
|
To install the 252Cf fission source to test the 3He neutron counters, Pb bricks which
had blocked the BRIKEN aperture have now been removed. |
Wed May 24 03:20:35 2017, CB, TD, Wednesday 24 May 8x
|
11.00 Merger found stopped at 03:27 - current file R24_7
Restarted Merge. Stopped Run control. Run control stopped, got error message - see attachment 1
nnaida 1-16 show error, nnaida 17-24 show stopped - see attachment 2
|
Tue May 23 03:01:52 2017, CB, TD, NN, OH, Tuesday 23 May 19x
|
11.02 DAQ continues OK
Current file May2017/R22_192
|
Mon May 22 10:29:11 2017, TD, FEE64 system console to Raspberry pi /dev/ttyUSB mapping
|
ttyUSB0 => last host=nnaida24, => last addr=10.1.2.24, ; #panics => 0 ; Not Finished
ttyUSB1 => last host=nnaida23, => last addr=10.1.2.23, ; #panics => 0 ; Not Finished
ttyUSB10 => last host=nnaida18, => last addr=10.1.1.18, ; #panics => 0 ; Not Finished
|
Mon May 22 10:21:29 2017, Patrick, Console mapping to FEE64 please
|
Please attach the list of ttyUSB to FEE64 console connection .
|
Mon May 22 09:12:56 2017, Patrick, Consoles reporting Options not available.... defaults operational ?
|
I have noticed from the console logs reports concerning an inability to open the Options CONTENTS files for the FEE64s and hence failure to load the
Options.
I have checked with similar files on nnsa here in Daresbury and they are set for permissions "-rwxrwxrwx. 1 npg npgstaff 1115 |
Mon May 22 02:34:51 2017, CB, TD, Monday 22 May 16x
|
10.35 DAQ continues OK
Current file May2017/R19_253
|
Mon May 22 08:43:10 2017, CB, TD, Patrick, Monday 22 May
|
> 10.35 DAQ continues OK
> Current file May2017/R19_253
>
|
Mon May 22 08:53:42 2017, CB, TD, Patrick, Monday 22 May
|
> Concerning nnaida7 and the failure of calibration..... have you tried to calibrate it using the FADC Align & Control ?
> If it still fails then there is a question about the quality of the clock signal being received by this module.
> I will log through and look at the console log for any anomolies but please try and calibrate.
|
Mon May 22 08:29:26 2017, TD, Offline analysis R25_12 to R25_22 21x
|
Offline analysis of AIDA data files R25_12 to R25_22 using MIDASsort
Note
|
Sun May 21 10:58:01 2017, TD, Julabo FL11006 recirculating chiller refilled
|
18.55 Julabo FL11006 recirculating chiller refilled to "H" marker of the filling level indicator.
See http://www2.ph.ed.ac.uk/~td/AIDA/Information/Julabo%20FL11006.pdf
|