Tue Nov 29 05:18:50 2016, TD, Offline analysis of R31 10x
|
Offline analysis of AIDA data files from R31_0 to c. R31_5 (elapsed time 1120.45s)
Note impact of increased noise ( https://elog.ph.ed.ac.uk/AIDA/494 )on LEC spectra,
|
Tue Nov 29 12:21:35 2016, TD, Offline analysis R35_1 8x
|
S O R T C O M P L E T E ..... Tue Nov 29 20:45:36 2016
|
Wed Nov 30 04:56:40 2016, TD, Offline analysis R38_33 9x
|
Degrader 8mm Al fixed + ( 0.3mm W/1mm Al + 1mm W/1mm Al) variable
|
Wed Nov 30 05:30:20 2016, TD, Offline analysis R39_6 8x
|
Degrader 8mm Al fixed + ( 0.5mm W/1mm Al + 1mm W/1mm Al) variable
|
Wed Nov 30 06:33:52 2016, TD, Offline analysis R36_30 8x
|
Following target change from (CH2)n to C
|
Wed Nov 30 06:42:01 2016, TD, Offline analysis of R39_26 8x
|
Following degrader change to (8mm Al) fixed + ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m Al) variable
S O R T C O M P L E T E ..... Wed Nov 30 17:13:45 2016
|
Wed Nov 30 11:10:10 2016, TD, Correlation_Check.c  
|
cd /TapeData/RIBF03R1
~/td/a.out R31 10000 > /tmp/R31.out
~/td/a.out R31 24 > /tmp/R31-2.out
|
Wed Nov 30 11:36:32 2016, TD, Offline analysis of R41_2 8x
|
Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m Al) variable
Steering to F11 changed by PD
|
Thu Dec 1 09:46:06 2016, TD, Offline analysis of R43_59 9x
|
Variable degrader setting is now #2 + #3: 0.3 mm W + 1.0 mm W [+2 mm Al]
Centre ZDS @ 40Mg
|
Fri Dec 2 08:23:28 2016, TD, Offline analysis of R48_9   
|
Analysis of background, pulser off
S O R T C O M P L E T E ..... Fri Dec 2 17:11:14 2016
|
Sat Dec 3 10:49:36 2016, TD, Saturday 3 December  
|
19.48 DSSSD bias & leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
Ambient temperature +25.1 deg C, d.p. -3.0 deg C, RH 15.6% |
Sun Dec 4 03:44:12 2016, TD, Sunday 4 December 16x
|
12.45 DSSSD bias & leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
Ambient temperature +25.1 deg C, d.p. -3.0 deg C, RH 15.6%
|
Sun Dec 4 04:05:24 2016, TD, Report - low - DAQ SETUP sometimes produces Javascript error
|
DAQ SETUP sometimes produces Javascript error instead of a pop-up displaying
the status of the ReSync - see attachment 1
|
Sun Dec 4 05:46:42 2016, TD, SyncCheck RIBF03R1 & RIBF123R1 commissioning tests archived
|
The SyncCheck etc software used for the RIBF123R1 and RIBF03R1 commissioning
tests on d05 (user aida) has been archived as
|
Mon Dec 5 10:51:08 2016, TD, Monday 5 December    
|
19.50 DSSSD bias & leakage currents OK - see attachments 1 & 2
FEE64 temperatures HIGH - see attachment 3
FL11006 E01 low fluid level (actual halfway between minimum and middle visual markers)
|
Mon Dec 5 11:53:26 2016, TD, MACB test 42x
|
MACB configuration can be found at https://elog.ph.ed.ac.uk/AIDA/357
|
Tue Dec 6 02:20:29 2016, TD, Tuesday 6 December   
|
11.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
Ambient temperature +24.8 deg C, d.p. +3.6 deg C, RH 25.4%
|
Tue Dec 6 02:30:35 2016, TD, Report - low - significant variation in FEE64 boot times
|
Not something we were not aware of already but /var/log/messages illustrate the issue.
|
Wed Mar 29 00:02:49 2017, TD, Wednesday 29 March 21x
|
08.02 DAQ halted overnight
System checks OK *except* for nnaida1 global clocks error 6 and some SYNC errors - see attachments 1-5
|
Wed Mar 29 00:23:12 2017, TD, Analysis of Mar2017/R3 8x
|
Analysis of Mar2017/R3_0 ... R3_9 by MIDASsort
*** ENTRY finish
|