Entry  Mon Mar 27 03:29:05 2017, OH, TD, DK, CG, Monday 27 March 15x
11:28 Biases and leakages okm (see attachment 1)

14:00 Removed jumpers on cooling rack D. Noise was around 50 channels worse (FWHM of pulser peak) for all
Entry  Mon Mar 27 03:28:53 2017, DK, TD, JA, Clock settings at the waveform generator stage 
Clock settings for this experiment are slightly different than in the previous case.

Below are strictly the settings for the waveform generator itself.
Entry  Sun Mar 26 03:53:43 2017, CG, OH, Sunday 26th March bias_260317.pngnniada15_w_260317.png
10.30 Left DAQ running overnight to look for alphas in DSSDs.
      DSSD bias still ok @ 23.3oC (see att. 1).
      FEE temps ok.
Entry  Thu Mar 23 10:56:29 2017, CG, OH, Thursday 23rd March - DSSD replacement + move 7x

10.00 Investigating DSSD2 (MSL BB18-1000 3058-9) missing channels, found broken bond wires on rear side (~1/4).
      Replaced with 3058-3.
Entry  Tue Mar 21 08:04:43 2017, CG, OH, Tuesday 21 March - AIDA checks bias1.pnglayout4.pngnnaida19.pnglayout3.pngnnaida13.png
10.00 Powered system on and biased.
      Bias voltages and leakage currents ok (see att. 1). Ambient temp @23.1oC.
      
Entry  Thu Feb 2 13:44:02 2017, OH, T9 Test Bench nnaida114_10.pngnnaida11.pngnnaida114_7.png
T9 test setup at Daresbury was powered up and noise levels were checked using a pulser peak.

A 1V peak was used. For most channels this corresponded to a peak position at around +-11000 from the zero point at 9000.
Entry  Wed Feb 1 16:54:40 2017, CG, NP1306 run summary Run_Summary_NP1306.xlsx
 
Entry  Wed Jan 18 14:16:47 2017, Patrick Coleman-Smith, Repaired Modules returning to RIKEN 
Five modules are being returned to RIKEN after repair.

The MAC addresses are :-

00:04:a3:2a:ED:8f 
Entry  Tue Dec 6 06:38:46 2016, TD, Updated Patrick, CAEN N1419 HV output common mode noise 9x

There appears to be significant common mode noise on the output of the
CAEN N1419 4 Ch Reversible 500 V/200 ľA NIM HV Power Supply Module (USB)
Entry  Tue Dec 6 02:30:35 2016, TD, Report - low - significant variation in FEE64 boot times 

Not something we were not aware of already but /var/log/messages illustrate the issue.
Entry  Tue Dec 6 02:20:29 2016, TD, Tuesday 6 December 100.png101.png102.pngAIDA_leakage_current(13).xlsx
11.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
      Ambient temperature +24.8 deg C, d.p. +3.6 deg C, RH 25.4%
Entry  Mon Dec 5 11:53:26 2016, TD, MACB test 42x

MACB configuration can be found at https://elog.ph.ed.ac.uk/AIDA/357
Entry  Mon Dec 5 10:51:08 2016, TD, Monday 5 December 1.png2.png3.png4.pngAIDA_leakage_current(12).xlsx
19.50 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures HIGH - see attachment 3
       FL11006 E01 low fluid level (actual halfway between minimum and middle visual markers)
Entry  Sun Dec 4 05:46:42 2016, TD, SyncCheck RIBF03R1 & RIBF123R1 commissioning tests archived 

The SyncCheck etc software used for the RIBF123R1 and RIBF03R1 commissioning
tests on d05 (user aida) has been archived as
Entry  Sun Dec 4 04:05:24 2016, TD, Report - low - DAQ SETUP sometimes produces Javascript error 10.png

DAQ SETUP sometimes produces Javascript error instead of a pop-up displaying
the status of the ReSync - see attachment 1
Entry  Sun Dec 4 03:44:12 2016, TD, Sunday 4 December 16x
12.45 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
      Ambient temperature +25.1 deg C, d.p. -3.0 deg C, RH 15.6%
Entry  Sat Dec 3 10:49:36 2016, TD, Saturday 3 December 1.png2.png3.png
19.48 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
      Ambient temperature +25.1 deg C, d.p. -3.0 deg C, RH 15.6%
Entry  Fri Dec 2 09:58:54 2016, DK, Simple PID with LISE++ lise-41Al.pngSettingFallonDK.lppPIDintensity.png
I wrote this LISE++ file based on the Takechi .lpp modified by AE for 77Ni, 78Ni, 76Ni.

Basically, I changed the primary beam to 48Ca, reduced the production target thickness to 1 mm (I think it may
Entry  Fri Dec 2 09:47:58 2016, DK, F8 targets 
F8 target measurements, for posterity.

Plastic: ~39 to 40 mm
Entry  Fri Dec 2 09:47:45 2016, DK, F8 targets 
F8 targets, for posterity.

Plastic: 39~40 mm