AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 26 of 44  ELOG logo
Entry  Sun Oct 30 04:37:31 2016, TD, Spectrum layouts created 8x
The following spectrum layouts have been created

1  All Rate spectra
Entry  Sun Oct 30 03:26:55 2016, TD, Report - medium - cannot restore layout if currently displaying >16 galleries 

Cannot restore layout if currently displaying >16 galleries
Entry  Sun Oct 30 01:53:13 2016, TD, Sunday 30 October 9x
10.53 DAQ found stalled 
      Most recent files R89_102 last accessed 07.17
Entry  Sat Oct 29 07:26:59 2016, TD, AIDA ADC & disc data synchronisation check 14x

Following analysis of AIDA ADC & disc readout ( see https://elog.ph.ed.ac.uk/AIDA/404 )
changed timestamp resolution from 1us/channel to 20.48us/channel
Entry  Sat Oct 29 03:31:03 2016, TD, Saturday 29 October 11x

11.30 DAQ continues (R87)
      System-wide checks OK *except* SYNC errors & SYNC pulses - see attachments 1-4
Entry  Fri Oct 28 06:12:50 2016, TD, Friday 28 October 12x
14.12 DAQ stalled as expected
      Most recent file R86_245 last accessed 06.26
Entry  Thu Oct 27 10:57:49 2016, TD, AIDA data readout 100.png101.png102.png

Developing real-time AIDA data synchronisation test using MIDASsort
Entry  Thu Oct 27 10:54:14 2016, TD, Thursday 27 October  1.png2.png3.png
14.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
Entry  Tue Oct 25 02:06:34 2016, TD, Tuesday 25 October 13x
10.10 DAQ found stopped
      Most recent file R81_169, last accessed 06.26
Entry  Mon Oct 24 02:46:57 2016, TD, Monday 24 October 19x
10.47 DAQ found stopped, no merger error messages
      Most recent file R78_281, last accessed 06.46
Entry  Sun Oct 23 10:22:36 2016, TD, Report - high - merger SEGV 

Merger crashed during operation - see https://elog.ph.ed.ac.uk/AIDA/399
Entry  Sun Oct 23 02:34:12 2016, TD, Sunday 23 October  1.png2.png3.png4.png5.png
10.34 DAQ found stopped, no merger error messages
      Most recent file R74_296, last accessed 06.31
Entry  Sat Oct 22 02:32:37 2016, TD, Saturday 22 October 15x
10.32 DAQ found stopped, no merger error messages
      Most recent file R70_315, last accessed 06.46
Entry  Fri Oct 21 01:41:54 2016, TD, Friday 21 October 14x

09.38 DAQ (R66) continues OK
Entry  Thu Oct 20 20:00:14 2016, CG, Returned module tests @ DL 7x
Original system configuration before my arrival: nnaida11 - 2b:22:6e
                                                 nnaida12 - 2b:33:15
                                                 nnaida13 - 2b:09:ce
Entry  Thu Oct 20 01:30:10 2016, TD, Thursday 20 October 12x
09.30 DAQ found stopped, no merger error messages
      Most recent file R63_291, last accessed 06.46
Entry  Wed Oct 19 01:14:10 2016, TD, Wednesday 19 October 8x
09.13 DAQ found stopped, no merger error messages
      Most recent file R55_10, last accessed 19.17
      Restart merger OK
Entry  Tue Oct 18 06:56:52 2016, TD, DAQ status 

From the installation of the RG58 cable for the 50MHz TTL clock from BRIKEN DAQ
to AIDA Master MACB external clock input we observe DAQ stalls at c. 06.30 and
Entry  Tue Oct 18 01:43:04 2016, TD, Tuesday 18 October 33x
09/42 DAQ found stopped, no merger error messages
      Most recent file R52_211, last accessed 06.30
      Restart merger OK
Entry  Mon Oct 17 04:10:30 2016, TD, Monday 17 October 7x
12.05 DAQ found stopped
      Most recent file R49_226, last accessed 06.26
      Restart merger OK
ELOG V3.1.4-unknown