Entry  Wed Feb 24 15:46:11 2016, PJCS, OR64 - OR of all the ASIC discriminator channels after application of a mask IMG_0290.JPG
Firmware version8 number 8 has an OR64 added which can be routed, using the Local control, to the Trigger output and hence seen at the front panel Fast
NIM LEMO00 connector.
The OR64 is the OR of all the ASIC Discriminators. Each rising edge of a discriminator signal will give a 10ns pulse on the Fast NIM signal. If
Entry  Wed Sep 28 07:51:45 2016, TD & CG, New spectrum display software installed 

Spectrum display software updated
    maximum number of galleries increased to 30
Entry  Sat Jun 23 02:28:13 2018, TD, OH, New fuses fitted to USB-controlled ac mains relay 2290195.pdf

The input fuses of the USB-controlled ac mains relay have been changed from 2x 5x20mm 250V/16A to 2x 5x20mm
250V/20A cartridge, time-lag Littelfuse 0215020.MXP
Entry  Wed Nov 18 18:18:26 2015, CG, TD, New Kapton cable tests at DL nnaida11_noJumpers.pngnnaida14_detectorGNDjumper.pngnnaida14_shortDrainWires.pngnnaida14_shortDrainWiresSinglePoint_8us.pngIMG_20151118_164436.jpg
Note: kapton #7 may have broken pins next to (deliberately) broken ground pin. Unclear, but should not be used for bias until certain.
Detector BB18 2998-22 connected via 4 45cm kaptons and biased to +200V via nnaida12+14, with leakage current 4.310uA @ room temp 25.4oC.
Turned off FADCs as per PCS instructions in previous entry - no change. Turned back on.
Entry  Thu Nov 19 17:31:24 2015, CG, TD, New Kapton cable tests at DL nnaida11_wav.pngIMG_20151119_162831.jpg
Powered system on from the state it was in last night. Biased to +200V with leakage current 3.9uA at room temp 22.8oC.
Performance of nnaida14 at shaping time of 8us slightly worse than last night - peak now non-Gaussian and double peaked. New source of noise?
Trying different permutations of grounding options initially led to no improvements.
Entry  Fri Nov 20 16:29:49 2015, CG, New Kapton cable tests at DL nnaida14_goodGNDbetweenAll.png
Powered system up from state it was left in last night. Biased to +200V with leakage current 3.9uA @ room temp 23.3oC.
nnaida14 now performing as it was at the beginning of yesterday, with nnaida11 back to having noisy waveforms.
Tried various combinations of grounding to ascertain minimum possible configuration to maintain (or improve) current performance.
Entry  Wed Nov 25 19:24:39 2015, CG, TD, PJCS, New Kapton cable tests at DL 6x
Powered system on and biased to +200V at room temp of 22.4oC. Leakage current of 3.37uA.
Waveforms very noisy and spectra dominated by low E noise. Upon taking a close look at front end found one of the kaptons to have broken a connection.
Swapped it out for a spare.
Entry  Thu Nov 26 16:32:52 2015, CG, TD, New Kapton cable tests at DL 9x
Powered on system without issue. biased detector to -200V. Leakage current not stable, bouncing around between ~3.66 - 3.74uA. Room temp 22.0oC   
-> Peak widths similar to yesterday.
Changed through various permutations of jumper connections (field planes, detector grounds, bias ground reference).
Entry  Wed Dec 2 18:39:44 2015, CG, New Kapton cable tests at DL nnaida14_wav_noHVnoDetNoShielding.pngnnaida14_wav_noHVnoDetWithShielding.pngall1.8.L_noDetShaping2us.png
Powered on system ok.
Electrical connection between crate and mezzanines still persists, but only to the top cool plate (no connection to the bottom or sides), eith
resistance ~5-10 ohms
Entry  Thu Dec 3 16:28:46 2015, CG, TD, New Kapton cable tests at DL 18x
Spent whole day trying to isolate mezzanines from cooling crate.
Finally managed to increase resistance between crate and mezzanines from ~5 Ohms to ~380 kOhms with some masking tape and parcel tape over the
slots in the FEE modules in which rest the guide pins on the bottom of cooling crate.
Entry  Mon Mar 9 13:59:32 2015, TD, New AIDA support frame for F11/F12 @ RIKEN IMG_2798.JPG
 
Entry  Sat May 9 11:47:40 2015, TD, Network cabling & Raspberry Pi configuration IMG_2907.JPGIMG_2908.JPGIMG_2909.JPGIMG_2910.JPG
 
    Reply  Sat May 9 23:40:49 2015, TD, Network cabling & Raspberry Pi configuration 
 Hi Tom,
Please could you photo the power supply cabling and the MACBs.
Hope i'm not too late,
Entry  Tue Nov 8 14:29:34 2016, TD, OH, DK, NP1412 Run 4 
23:28 Run 4 Start
      Thick 6mm C target in beam
      
Entry  Tue Nov 8 13:06:18 2016, DK, TD, CG, OH, NP1412 Run 1 14_JST_2016.png
AIDA run with Takechi experiment. 71~73 Ni beam setting

F5 carbon target is:    IN

F7 CH2 target is:        OUT
Entry  Tue Nov 8 21:01:40 2016, CG, DK, NP1412 R9 
06.02 R9 started with Takechi group C target out and all variable degraders in.
      F5 C in. F7 empty. F11 empty.
      F11 plastic rate 1.1kHz.
Entry  Tue Nov 8 18:52:32 2016, CG, DK, NP1412 R7 R8 bias1.pngbias2.pngbias1.pngbias2.png
03.50 74-76Ni beam delivered to F11.
      F11 plastic rate ~1kHz.
      F5 C target in. F7 empty. F11 C target in.
Entry  Tue Nov 8 15:10:16 2016, CG, TD, DK, OH, NP1412 R5 R6 bias1.pngbias2.png
00.15 Setting changed to 71,72,73Ni. All variable degraders in.
      Will remove while watching rates to settle on degrader setting.
      F5 CH2 in. F7 CH2 out. F11 C target in.
Entry  Tue Nov 8 14:22:16 2016, TD, OH, DK, NP1412 R3 
11:21 Run 3 Started
      Degrader moved upstream. AIDA moved to centre of BRIKEN. Fixed degrader moved upstream from centre of BRIKEN.
11:25 Run 3 Stopped
Entry  Thu Nov 10 09:56:20 2016, TD, OH, ML, NP1412 R26 R27 8x
start 18.55 10.11.16
stop 
AIDA filename R26_0