AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 34 of 46  ELOG logo
Entry  Sun Nov 18 02:02:48 2018, TD, Latest detector bias & leakage current spreadsheet (URL and csv & xlsx files) AIDA_leakage_current(17).xlsxAIDA_leakage_current_-_Sep2018.csv
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1347508769
Entry  Sat Oct 1 01:57:56 2016, TD & PJCS, Latest MACB firmware - 16 April 2015 macb_top_revB.jed
 
Entry  Tue Apr 21 09:39:00 2015, AE, LISE estimates for implantation setup [updated] LISE_estimates_84Zn.docxLISE_estimates_94Se.docx
[UPDATED 22/4: initial LISE file had incorrect thickness for MACi plastic]

Calculations for Al degrader thickness required to implant ions in AIDA DSSD stack.
Entry  Sun Jun 24 09:08:03 2018, 3OH, TD, June 2018 New Stack Configuration IMG_20180623_104349.jpgIMG_20180623_113315.jpg
Stack has been changed in configuration from a 6 DSSD stack to 8 DSSD stack.
What was detectors 1-6 are now 3-8 with 2 new detectors added to the front.
Entry  Sun May 21 10:58:01 2017, TD, Julabo FL11006 recirculating chiller refilled 15.png
18.55 Julabo FL11006 recirculating chiller refilled to "H" marker of the filling level indicator.

      See http://www2.ph.ed.ac.uk/~td/AIDA/Information/Julabo%20FL11006.pdf
Entry  Fri Nov 17 03:32:31 2017, CB, Julabo FL11006 recirculating chiller refilled 
12:32 Chiller found almost empty & still working at 20C. Refilled to overflow.
Entry  Mon Mar 9 16:45:35 2015, TD, Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains  7x

3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz via local transformer
Entry  Sun Feb 15 22:30:48 2015, TD, Julabo FL11006 Operating Manual Julabo_FL11006.pdf
 
Entry  Sun Nov 27 22:35:37 2016, Liu, PV, AE, Ion hit pattern in AIDA after degrader changing aida_ion_hitpattern_run26_51to63.png
After changing degrader to optimize 40Mg, hit pattern in AIDA is shown in figure below.

The implantation position changed from right side position of  first DSSD to center position of last DSSD.
Entry  Wed Feb 18 11:25:54 2015, Patrick Coleman-Smith, Investigations into removing HV noise 
 With the system in T9 and a Keithley Source Meter supplying HV to the detector.
The source meter supplies 200V and measures the current .... 
I noticed that the current value was not stable... varying by +/-0.5uA. In conversation with Marcello i learnt that normally much more stable than
Entry  Tue Mar 26 14:02:59 2019, OH, Inventory to be shipped back 
Inventory is currently packaged up under the AIDA desk in B3F

Entry  Sun Jul 1 08:25:24 2018, OH, Inventory 180701_Cable_Inventory.xlsx
Attached is an updated inventory of the cables and adapter boards we have in RIKEN.
Entry  Fri May 22 11:26:43 2015, TD, Internal Server Error - attempting to save settings to /MIDAS/DB/EXPERIMENTS/AIDA/2015May22-11.19.38 
Got the error Server Internal Error
while trying to obtain /AIDA/SaveRestore/SaveRestore.tml. 
can't read "env(MIDASBASE)": no such variable     while executing "file join $env(MIDASBASE) XilinxLinux ppc_4xx rfs $fee64 tmp 
Entry  Sat Oct 1 09:34:23 2016, TD, Installing latest (16 April 2015) MACB firmware Untitled.png
Installed Xilinx 14.7 LabTools + (free) WebPack license

Start iMPACT
Entry  Thu Jul 7 17:16:11 2016, Patrick Coleman-Smith, Install & Run new firmware with diagnostics for the SYNC 
Connected to aidas from daresbury.
Started Firefox with windows for Rpi, Merge, Runcontrol.
Power on FEEs from Pi.
Entry  Mon Nov 28 13:12:31 2016, PV, AE, Liu, Implantation profile in AIDA with 8mm Al replacing 3 mm Pb 10.pngimp_dssd_106x.pngimp_pid_106x.pngimp_xy_106x.pngpid_r106x.png
Data for ~3 hrs: Nov 28th, 20:06 to 23:16

Bigrips run 1060 to 1062

AIDA run R30_ 2 to R30_40
Entry  Thu Dec 1 10:58:54 2016, PV, TD, Liu, Implantation profile in AIDA , after switch back to the previous ZDS setting (AIDA 43_63 to 43_71, bigrips run 1129) 51.png45.png31.png
 
Entry  Thu Dec 1 08:13:06 2016, PV,Liu, TD, Implantation profile in AIDA , after changing the ZDS setting to center at 41Al, AIDA 43_ 33 to 43 36.png24.png50.png
Bigrips run 1127

AIDA run 43_ 33 to 43
Entry  Wed Nov 30 08:41:37 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 37 to 46, after changing degrader at 16:23 01.png52.png44.png

Degrader setting:
Variable degrader:
0.5 mm W + 1 mm Al : in
0.3 mm W + 1 mm Al : in
1 mm W + 1 mm Al : in
Fix degrader:
20mm Al+ 0,2 mm Al

See
https://elog.ph.ed.ac.uk/AIDA/502 for comparison
Entry  Wed Nov 30 06:31:04 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 2 to 9, after changing degrader at 13:30 29.png22.png12.png
Degrader setting was:
Variable degrader:
0.5 mm W + 1 mm Al : in
ELOG V3.1.3-7933898