AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
AIDA, Page 34 of 46
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
920 Entries
Goto page
Previous
1
,
2
,
3
...
33
, 34,
35
...
44
,
45
,
46
Next
Sun Nov 18 02:02:48 2018, TD, Latest detector bias & leakage current spreadsheet (URL and csv & xlsx files)
Sat Oct 1 01:57:56 2016, TD & PJCS, Latest MACB firmware - 16 April 2015
Tue Apr 21 09:39:00 2015, AE, LISE estimates for implantation setup [updated]
Sun Jun 24 09:08:03 2018, 3OH, TD, June 2018 New Stack Configuration
Sun May 21 10:58:01 2017, TD, Julabo FL11006 recirculating chiller refilled
Fri Nov 17 03:32:31 2017, CB, Julabo FL11006 recirculating chiller refilled
Mon Mar 9 16:45:35 2015, TD, Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains
7x
Sun Feb 15 22:30:48 2015, TD, Julabo FL11006 Operating Manual
Sun Nov 27 22:35:37 2016, Liu, PV, AE, Ion hit pattern in AIDA after degrader changing
Wed Feb 18 11:25:54 2015, Patrick Coleman-Smith, Investigations into removing HV noise
Tue Mar 26 14:02:59 2019, OH, Inventory to be shipped back
Sun Jul 1 08:25:24 2018, OH, Inventory
Fri May 22 11:26:43 2015, TD, Internal Server Error - attempting to save settings to /MIDAS/DB/EXPERIMENTS/AIDA/2015May22-11.19.38
Sat Oct 1 09:34:23 2016, TD, Installing latest (16 April 2015) MACB firmware
Thu Jul 7 17:16:11 2016, Patrick Coleman-Smith, Install & Run new firmware with diagnostics for the SYNC
Mon Nov 28 13:12:31 2016, PV, AE, Liu, Implantation profile in AIDA with 8mm Al replacing 3 mm Pb
Thu Dec 1 10:58:54 2016, PV, TD, Liu, Implantation profile in AIDA , after switch back to the previous ZDS setting (AIDA 43_63 to 43_71, bigrips run 1129)
Thu Dec 1 08:13:06 2016, PV,Liu, TD, Implantation profile in AIDA , after changing the ZDS setting to center at 41Al, AIDA 43_ 33 to 43
Wed Nov 30 08:41:37 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 37 to 46, after changing degrader at 16:23
Wed Nov 30 06:31:04 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 2 to 9, after changing degrader at 13:30
Goto page
Previous
1
,
2
,
3
...
33
, 34,
35
...
44
,
45
,
46
Next
ELOG V3.1.3-7933898