AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 34 of 46  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun Nov 18 02:02:48 2018, TD, Latest detector bias & leakage current spreadsheet (URL and csv & xlsx files) AIDA_leakage_current(17).xlsxAIDA_leakage_current_-_Sep2018.csv
Entry  Sat Oct 1 01:57:56 2016, TD & PJCS, Latest MACB firmware - 16 April 2015 macb_top_revB.jed
Entry  Tue Apr 21 09:39:00 2015, AE, LISE estimates for implantation setup [updated] LISE_estimates_84Zn.docxLISE_estimates_94Se.docx
Entry  Sun Jun 24 09:08:03 2018, 3OH, TD, June 2018 New Stack Configuration IMG_20180623_104349.jpgIMG_20180623_113315.jpg
Entry  Sun May 21 10:58:01 2017, TD, Julabo FL11006 recirculating chiller refilled 15.png
Entry  Fri Nov 17 03:32:31 2017, CB, Julabo FL11006 recirculating chiller refilled 
Entry  Mon Mar 9 16:45:35 2015, TD, Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains  7x
Entry  Sun Feb 15 22:30:48 2015, TD, Julabo FL11006 Operating Manual Julabo_FL11006.pdf
Entry  Sun Nov 27 22:35:37 2016, Liu, PV, AE, Ion hit pattern in AIDA after degrader changing aida_ion_hitpattern_run26_51to63.png
Entry  Wed Feb 18 11:25:54 2015, Patrick Coleman-Smith, Investigations into removing HV noise 
Entry  Tue Mar 26 14:02:59 2019, OH, Inventory to be shipped back 
Entry  Sun Jul 1 08:25:24 2018, OH, Inventory 180701_Cable_Inventory.xlsx
Entry  Fri May 22 11:26:43 2015, TD, Internal Server Error - attempting to save settings to /MIDAS/DB/EXPERIMENTS/AIDA/2015May22-11.19.38 
Entry  Sat Oct 1 09:34:23 2016, TD, Installing latest (16 April 2015) MACB firmware Untitled.png
Entry  Thu Jul 7 17:16:11 2016, Patrick Coleman-Smith, Install & Run new firmware with diagnostics for the SYNC 
Entry  Mon Nov 28 13:12:31 2016, PV, AE, Liu, Implantation profile in AIDA with 8mm Al replacing 3 mm Pb 10.pngimp_dssd_106x.pngimp_pid_106x.pngimp_xy_106x.pngpid_r106x.png
Entry  Thu Dec 1 10:58:54 2016, PV, TD, Liu, Implantation profile in AIDA , after switch back to the previous ZDS setting (AIDA 43_63 to 43_71, bigrips run 1129) 51.png45.png31.png
Entry  Thu Dec 1 08:13:06 2016, PV,Liu, TD, Implantation profile in AIDA , after changing the ZDS setting to center at 41Al, AIDA 43_ 33 to 43 36.png24.png50.png
Entry  Wed Nov 30 08:41:37 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 37 to 46, after changing degrader at 16:23 01.png52.png44.png
Entry  Wed Nov 30 06:31:04 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 2 to 9, after changing degrader at 13:30 29.png22.png12.png
ELOG V3.1.3-7933898