Entry  Tue Feb 23 12:16:08 2016, TD, Tuesday 23 February 2016 60.png
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.570uA, ambient temperature +19.8 deg C
 
Entry  Mon Feb 22 16:47:28 2016, PJCS, Version 8 in nnaida2 outputting and merging two streams 
nnaida2 , the bare test FEE64 in T9, is successfully running with two streams connected to nndhcp177 ( a Linux64 computer )
Merge running on nndhcp177 is receiving the streams and merging them.
nnaida2 has a slow pulser , 100Hz , connected to one waveform input.
Entry  Mon Feb 22 15:19:52 2016, PJCS, T9 System changed to version 8 LED_window.png
I have changed the T9 system to be using Version 8.
Tests using the detector and pulser seem to be ok.
Transmission to the Merge and Merging operating ok
Entry  Fri Feb 19 10:23:31 2016, TD, 19 February 2016 
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.070uA, ambient temperature +20.2 deg C
 
Entry  Thu Feb 18 13:23:03 2016, TD, Report: high: MERGE error messages 
During R30 ( see https://elog.ph.ed.ac.uk/AIDA/154 ) obtain the following merger error messages
(rate ~ 10 per minute) with merger rate ~100-200k data items/s 
Entry  Thu Feb 18 10:23:48 2016, TD, Thursday 18 February 19x
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.200uA, ambient temperature +20.1 deg C
 
Entry  Wed Feb 17 11:54:50 2016, CG, TD, 17 February 2016 6x
File R17 -> pulser walkthrough.
     - Started ~10.00
     - Pulser peak amplitude taken from 9.0V to 1.0 V in 1.0V steps
Entry  Tue Feb 16 17:32:21 2016, CG, TD, 16 February 2016 
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.150uA, ambient temperature +20.1 deg C
 
Entry  Wed Feb 10 10:56:02 2016, CG, TD, 9-10 February 2016 7x
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.540uA, ambient temperature +19.9 deg C
 
Entry  Tue Feb 9 17:27:12 2016, CG, TD, Ribbon cable + coupler tests at DL 8-9th Feb allnnaida_inSafe_cablesIsolated_0.5us.pngallnnaida_inSafe_cablesIsolated_1us.pngallnnaida_inSafe_cablesIsolated_2us.pngallnnaida_inSafe_cablesIsolated_4us.pngallnnaida_inSafe_cablesIsolated_8us.png
08/02/16
Spoke to PJC-S -> Ethernet cables from FEEs to switch are all 4m Cat6.
System powered on with bias to detector of +200V and leakage current of 6.4uA at room temp 19.0oC.
Entry  Wed Feb 3 15:34:30 2016, CG, TD, Ribbon cable + coupler tests at DL 1st-2nd Feb 
01/02/16
Started up system. Biased det to +200V 
Entry  Tue Feb 2 17:32:46 2016, CG, TD, Tuesday 2 February 2016 9x
Bias +200V, I_L +6.955uA, ambient temp +20.2 deg C

MSL type BB18(DS)-1000 2998-20
Entry  Tue Feb 2 14:08:44 2016, CG, TD, Report: Low - No SYNCs from FEEs noSYNCs.png
Currently running with a source, and everything seems to be running fine in terms of histograms doing what we expect, no error messages etc.
Tried to start the merger and tape server, but the merger reports as waiting for the first SYNC.
Checked the stats page and sure enough, no SYCs are being produced.
Entry  Thu Jan 28 13:53:29 2016, CG, TD, Ribbon cable + coupler tests at DL - 25-26th Jan 15x
 25/01/16
On start up, received error when trying to access spectrum browser (attachment 1)   => required restart of 'Http for AIDA'
At 2us shaping time, and all other setting as last week, the situation remains the same
Entry  Wed Jan 27 14:54:48 2016, TD, CG, Wednesday 27 January 2016 11.png14.png
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +8.110uA, ambient temperature +20.2 deg C
Entry  Wed Jan 20 17:02:47 2016, CG, TD, Ribbon cable + coupler tests at DL 17x
 18/01/16
Set up as last week but with 8us shaping time.
With detector connected, still seeing rail-to-rail noise on waveforms in nnaida13 and double peaking in all nnaida.
Entry  Wed Jan 20 16:44:02 2016, TD, Report - LOW - spectrum browser x/y expand 

Spectrum Browser
Entry  Wed Jan 20 12:00:19 2016, CG, TD, Wednesday 20 January 2016 6x
11.58 Repeat yesterday's test - no significant change observed

nnaida11 - input -, shaping time 2us - attachment 1
Entry  Tue Jan 19 18:09:53 2016, CG, TD, Tuesday 19 january 2016 1.png2.png3.png4.png

18.00 Swapped input cables to nnaida11 and nnaida14
      both cables LH coupler + 2x 34-way Samtec ribbon cables + 3M 1245 1.4mil Copper screen w/ground wire
Entry  Fri Jan 15 16:50:09 2016, CG, TD, Ribbon cable + couple tests at DL 20x
 12/01/16      (Attachments 1-8)
FEEs set up as per ELOG entry 136 (15/12/15)
Connected cables as follows: